A set of study questions related to underground storage tanks (usts) and their regulations. It includes multiple-choice questions covering various aspects of ust systems, such as compliance with regulations, system components, containment requirements, and testing procedures. Each question is accompanied by the correct answer, making it a useful resource for students or professionals preparing for exams or seeking to enhance their knowledge of ust regulations and practices. The questions cover topics such as the definition of an underground storage tank system, under-dispenser containment requirements, eld testing, reporting unauthorized releases, and cathodic protection system maintenance. Particularly relevant to california regulations.
Typology: Exams
1 / 68
This page cannot be seen from the preview
Don't miss anything!





























































The||\//|| regulations||\//|| to||\//|| enforce||\//|| compliance||\//|| of||\//|| underground||\//|| storage||\//|| tank||\//|| systems||\//|| in||\//|| the||\//|| state||\//|| are||\//|| found||\//|| in? a.)||\//|| Code||\//|| of||\//|| Federal||\//|| Regulations,||\//|| 40 ||\//|| CFR||\//|| Part||\//|| 281 b.)||\//|| California||\//|| Code||\//|| of||\//|| Regulations,||\//|| Title||\//|| 23,||\//|| Chapter||\//|| 16 c.)||\//|| Code||\//|| of||\//|| Federal||\//|| Regulations,||\//|| 40 ||\//|| CFR||\//|| Part||\//|| 280 d.)||\//|| California||\//|| Code||\//|| of||\//|| Regulations,||\//|| Title||\//|| 23,||\//|| Chapter||\//|| 17 ||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| California||\//|| Code||\//|| of||\//|| Regulations;||\//|| Title||\//|| 23,||\//|| Chapter||\//|| 16 By||\//|| definition||\//|| an||\//|| "underground||\//|| storage||\//|| tank||\//|| system"||\//|| includes a.)||\//|| The||\//|| tank,||\//|| all||\//|| connected||\//|| piping||\//|| and||\//|| dispensers b.)||\//|| The||\//|| tank,||\//|| all||\//|| connected||\//|| piping,||\//|| ancillary||\//|| equipment||\//|| and||\//|| containment||\//|| system c.)||\//|| Only||\//|| the||\//|| tank d.)||\//|| Only||\//|| tanks||\//|| totally||\//|| beneath||\//|| the||\//|| surface||\//|| of||\//|| the||\//|| ground||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| The||\//|| tank,||\//|| all||\//|| connected||\//|| piping,||\//|| ancillary||\//|| equipment||\//|| and||\//|| containment||\//|| system (H&SC,||\//|| Sec||\//|| 25281(z)) Under-dispenser||\//|| containment||\//|| was||\//|| required||\//|| for||\//|| all||\//|| UST||\//|| systems||\//|| by||\//|| ___________. a.)||\//|| December||\//|| 31,||\//|| 2003 b.)||\//|| July||\//|| 1,||\//|| 1987
c.)||\//|| January||\//|| 1,||\//|| 1984 d.)||\//|| January||\//|| 1,||\//|| 2000 ||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| December||\//|| 31,||\//|| 2003 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(g)(C) According||\//|| to||\//|| California||\//|| Law,||\//|| UST||\//|| systems||\//|| installed||\//|| after||\//|| July||\//|| 1,||\//|| 2003,||\//|| require||\//|| a||\//|| one- time||\//|| ELD||\//|| test||\//|| to||\//|| ensure||\//|| that||\//|| the||\//|| tank||\//|| is||\//|| product||\//|| tight... a.)||\//|| If||\//|| the||\//|| tank||\//|| is||\//|| located||\//|| within||\//|| one||\//|| (1)||\//|| mile||\//|| of||\//|| a||\//|| public||\//|| drinking||\//|| water||\//|| well b.)||\//|| If||\//|| the||\//|| tank||\//|| is||\//|| located||\//|| within||\//|| 1000 ||\//|| feet||\//|| of||\//|| a||\//|| public||\//|| drinking||\//|| water||\//|| well c.)||\//|| Unless||\//|| the||\//|| tank||\//|| is||\//|| equipped||\//|| with||\//|| secondary||\//|| containment d.)||\//|| In||\//|| all||\//|| cases||\//|| - ||\//|| correct||\//|| answer✔✔For||\//|| ALL||\//|| tanks||\//|| before||\//|| use||\//|| (H&SC||\//|| 25290.2||\//|| (I)) d.)||\//|| In||\//|| all||\//|| cases H&SC,||\//|| Sec||\//|| 25290.2(i) The||\//|| written||\//|| report||\//|| submitted||\//|| to||\//|| the||\//|| local||\//|| agency||\//|| after||\//|| an||\//|| unauthorized||\//|| release||\//|| is||\//|| required||\//|| to||\//|| include||\//|| the||\//|| following||\//|| except: a.)||\//|| Description||\//|| of||\//|| actions||\//|| taken||\//|| to||\//|| stop||\//|| the||\//|| release b.)||\//|| Cause||\//|| of||\//|| the||\//|| release c.)||\//|| Method||\//|| of||\//|| disposal||\//|| of||\//|| released||\//|| product d.)||\//|| Date||\//|| on||\//|| which||\//|| the||\//|| release||\//|| was||\//|| discovered||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| Cause||\//|| of||\//|| the||\//|| release CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2652(c)
CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2637(a) Records||\//|| of||\//|| cathodic||\//|| protection||\//|| system||\//|| maintenance||\//|| must||\//|| be||\//|| kept||\//|| on||\//|| file||\//|| for||\//|| ______________. a.)||\//|| 10 ||\//|| years b.)||\//|| 1.5||\//|| years c.)||\//|| 3 ||\//|| years d.)||\//|| 6.5||\//|| years||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| 6.5||\//|| years CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2712(b) Impressed||\//|| current||\//|| cathodic||\//|| protection||\//|| systems||\//|| shall||\//|| be||\//|| inspected||\//|| no||\//|| less||\//|| than||\//|| every||\//|| ___________||\//|| to||\//|| ensure||\//|| that||\//|| they||\//|| are||\//|| in||\//|| proper||\//|| working||\//|| order: a.)||\//|| 60 ||\//|| days b.)||\//|| 90 ||\//|| days c.)||\//|| 30 ||\//|| days d.)||\//|| 120 ||\//|| days||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| 60 ||\//|| days CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2635(a)(2) Monthly||\//|| monitoring||\//|| data||\//|| must||\//|| be||\//|| kept||\//|| on||\//|| file||\//|| for||\//|| _________________. a.)||\//|| 3 ||\//|| years b.)||\//|| 6.5||\//|| years c.)||\//|| 5 ||\//|| years
d.)||\//|| For||\//|| the||\//|| life||\//|| of||\//|| the||\//|| UST||\//|| system||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| 3 ||\//|| years CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2712(b) By||\//|| December||\//|| 22,||\//|| 1998,||\//|| all||\//|| automatic||\//|| line||\//|| leak||\//|| detectors||\//|| installed||\//|| on||\//|| single-walled||\//|| pressurized||\//|| piping||\//|| must||\//|| be||\//|| capable||\//|| of: a.)||\//|| Restricting||\//|| product||\//|| flow b.)||\//|| Triggering||\//|| an||\//|| audible||\//|| and||\//|| visual||\//|| alarm c.)||\//|| Shutting||\//|| down||\//|| the||\//|| pumping||\//|| system d.)||\//|| Shutting||\//|| off||\//|| the||\//|| flow||\//|| at||\//|| the||\//|| dispenser||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| Shutting||\//|| down||\//|| the||\//|| pumping||\//|| system CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2666(c) When||\//|| an||\//|| automatic||\//|| tank||\//|| gauge||\//|| is||\//|| utilized||\//|| for||\//|| single-walled||\//|| tank||\//|| leak||\//|| detection,||\//|| it||\//|| shall||\//|| generate||\//|| a||\//|| post-test||\//|| hard||\//|| copy||\//|| data||\//|| report||\//|| of||\//|| the||\//|| following||\//|| information,||\//|| except: a.)||\//|| Liquid||\//|| volume b.)||\//|| Fuel||\//|| depth c.)||\//|| Outside||\//|| air||\//|| temperature d.)||\//|| Time||\//|| and||\//|| date||\//|| of||\//|| test||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| Outside||\//|| air||\//|| temperature CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2643(b)(1) If||\//|| a||\//|| UST||\//|| system||\//|| is||\//|| utilizing||\//|| an||\//|| overfill||\//|| alarm,||\//|| the||\//|| alarm||\//|| must||\//|| be||\//|| triggered||\//|| to||\//|| alert||\//|| the||\//|| transfer||\//|| operator||\//|| when||\//|| the||\//|| tank||\//|| is||\//|| no||\//|| more||\//|| than||\//|| ___________||\//|| full
After||\//|| completion||\//|| of||\//|| enhanced||\//|| leak||\//|| detection||\//|| (ELD)||\//|| test,||\//|| the||\//|| ELD||\//|| test||\//|| results||\//|| must||\//|| be||\//|| submitted||\//|| to||\//|| the||\//|| _________________. a.)||\//|| The||\//|| local||\//|| agency b.)||\//|| The||\//|| SWRCB||\//|| c.)||\//|| Owner||\//|| of||\//|| the||\//|| UST||\//|| system d.)||\//|| To||\//|| both||\//|| the||\//|| SWRCB||\//|| and||\//|| the||\//|| local||\//|| agency||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| To||\//|| both||\//|| the||\//|| SWRCB||\//|| and||\//|| the||\//|| local||\//|| agency CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2644.1(a)(5) Which||\//|| agency||\//|| approves||\//|| a||\//|| site-specific||\//|| variance||\//|| which||\//|| allows||\//|| for||\//|| an||\//|| alternative||\//|| method||\//|| of ||\//|| construction||\//|| or||\//|| monitoring: a.)||\//|| The||\//|| Regional||\//|| Water||\//|| Quality||\//|| Board b.)||\//|| The||\//|| State||\//|| Water||\//|| Resources||\//|| Control||\//|| Board c.)||\//|| The||\//|| Department||\//|| of||\//|| Toxic||\//|| Substance||\//|| Control d.)||\//|| The||\//|| local||\//|| agency||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| The||\//|| Regional||\//|| Water||\//|| Quality||\//|| Board CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2681(a) A||\//|| permit||\//|| to||\//|| operate||\//|| a||\//|| UST||\//|| system||\//|| must||\//|| have||\//|| all||\//|| of||\//|| the||\//|| following||\//|| listed||\//|| on||\//|| the||\//|| permit,||\//|| EXCEPT: a.)||\//|| The||\//|| state||\//|| UST||\//|| identification||\//|| number(s) b.)||\//|| Name||\//|| of||\//|| the||\//|| tank||\//|| manufacturer||\//|| and||\//|| tank||\//|| capacity||\//|| c.)||\//|| Permit||\//|| expiration||\//|| date
d.)||\//|| Monitoring||\//|| requirements||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| Name||\//|| of||\//|| the||\//|| tank||\//|| manufacturer||\//|| and||\//|| tank||\//|| capacity CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2712(c) All||\//|| underground||\//|| pressurized||\//|| product||\//|| piping||\//|| shall||\//|| have||\//|| an||\//|| automatic||\//|| line||\//|| leak||\//|| detector||\//|| capable||\//|| of||\//|| detecting||\//|| a||\//|| 3-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| installed||\//|| by______________. a.)||\//|| July||\//|| 1,||\//|| 2003 b.)||\//|| November||\//|| 9,||\//|| 2004 c.)||\//|| July||\//|| 1,||\//|| 2004 d.)||\//|| July||\//|| 1,||\//|| 1987 ||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| November||\//|| 9,||\//|| 2004 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(f)(3) A||\//|| temporary||\//|| closure||\//|| is||\//|| appropriate||\//|| for||\//|| which||\//|| of||\//|| the||\//|| following: a.)||\//|| The||\//|| UST||\//|| system||\//|| is||\//|| empty||\//|| and||\//|| will||\//|| be||\//|| removed||\//|| from||\//|| service||\//|| indefinitely b.)||\//|| The||\//|| UST||\//|| system||\//|| has||\//|| ceased||\//|| to||\//|| store||\//|| hazardous||\//|| materials||\//|| but||\//|| will||\//|| be||\//|| used||\//|| within||\//|| the||\//|| next||\//|| 12 ||\//|| consecutive||\//|| months c.)||\//|| The||\//|| UST||\//|| system||\//|| is||\//|| unable||\//|| to||\//|| meet||\//|| compliance||\//|| requirements||\//|| and||\//|| will||\//|| be||\//|| removed d.)||\//|| The||\//|| UST||\//|| system||\//|| has||\//|| been||\//|| red-tagged||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| The||\//|| UST||\//|| system||\//|| has||\//|| ceased||\//|| to||\//|| store||\//|| hazardous||\//|| materials||\//|| but||\//|| will||\//|| be||\//|| used||\//|| within||\//|| the||\//|| next||\//|| 12 ||\//|| consecutive||\//|| months CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2671 ||\//|| &||\//|| 2670
The||\//|| exterior||\//|| surface||\//|| of||\//|| an||\//|| underground||\//|| storage||\//|| tank||\//|| must||\//|| bear||\//|| a||\//|| marking||\//|| or||\//|| label||\//|| which ||\//|| shows||\//|| the||\//|| following||\//|| information,||\//|| except: a.)||\//|| Design||\//|| pressure||\//|| in||\//|| psig b.)||\//|| Useable||\//|| capacity||\//|| in||\//|| gallons. c.)||\//|| Width||\//|| of||\//|| the||\//|| interstitial||\//|| space d.)||\//|| Identity||\//|| of||\//|| manufacturer||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| Width||\//|| of||\//|| the||\//|| interstitial||\//|| space CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2631(b) Which||\//|| of||\//|| the||\//|| following||\//|| is||\//|| not||\//|| a||\//|| confined||\//|| space: a.)||\//|| A||\//|| really||\//|| deep||\//|| turbine||\//|| sump b.)||\//|| A||\//|| space||\//|| not||\//|| designed||\//|| for||\//|| continuous||\//|| employee||\//|| occupancy c.)||\//|| An||\//|| area||\//|| with||\//|| limited||\//|| access d.)||\//|| An||\//|| area||\//|| with||\//|| limited||\//|| ventilation||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| An||\//|| area||\//|| with||\//|| limited||\//|| ventilation CCR||\//|| Title||\//|| 8,||\//|| Sec||\//|| 5157(b) Records||\//|| for||\//|| UST||\//|| construction,||\//|| repairs,||\//|| lining,||\//|| and||\//|| upgrades||\//|| must||\//|| be||\//|| kept||\//|| for: a.)||\//|| 3 ||\//|| years b.)||\//|| 10 ||\//|| years c.)||\//|| 5 ||\//|| years d.)||\//|| The||\//|| life||\//|| of||\//|| the||\//|| tank||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| The||\//|| life||\//|| of||\//|| the||\//|| tank
CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2712(b) Under-dispenser||\//|| containment||\//|| was||\//|| required||\//|| at||\//|| the||\//|| time||\//|| of||\//|| installation||\//|| for||\//|| all||\//|| UST||\//|| systems||\//|| installed||\//|| after||\//|| _________________. a.)||\//|| July||\//|| 1,||\//|| 1987 b.)||\//|| January||\//|| 1,||\//|| 2000 c.)||\//|| January||\//|| 1,||\//|| 1984 d.)||\//|| December||\//|| 31,||\//|| 2003 ||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| January||\//|| 1,||\//|| 2000 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(g)(1)(A) Cathodic||\//|| protection||\//|| systems||\//|| must||\//|| be||\//|| inspected||\//|| by||\//|| a||\//|| certified||\//|| cathodic||\//|| protection||\//|| tester||\//|| within||\//|| __________________months||\//|| of||\//|| installation: a.)||\//|| 3 b.)||\//|| 6 c.)||\//|| 12 d.)||\//|| 18 ||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| 6 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2635(a)(2)(A) A||\//|| secondary||\//|| containment||\//|| system||\//|| which||\//|| is||\//|| not||\//|| an||\//|| integral||\//|| part||\//|| of||\//|| primary||\//|| containment||\//|| shall||\//|| be||\//|| designed||\//|| and||\//|| constructed||\//|| according||\//|| to||\//|| an||\//|| engineering||\//|| specification||\//|| approved||\//|| by||\//|| a||\//|| third||\//|| party.||\//|| The||\//|| secondary||\//|| containment||\//|| system||\//|| shall||\//|| contain||\//|| ______________||\//|| of||\//|| the||\//|| volume ||\//|| of||\//|| the||\//|| largest||\//|| primary||\//|| container||\//|| within||\//|| it,||\//|| in||\//|| the||\//|| case||\//|| of||\//|| multiple||\//|| primary||\//|| containers:
H&SC,||\//|| Sec||\//|| 25290.1(c) If||\//|| the||\//|| owner/operator||\//|| fails||\//|| to||\//|| correct||\//|| a||\//|| significant||\//|| violation||\//|| within||\//|| _________||\//|| business||\//|| day(s)||\//|| from||\//|| receipt||\//|| of||\//|| the||\//|| notice,||\//|| the||\//|| local||\//|| agency||\//|| may||\//|| affix||\//|| a||\//|| red||\//|| tag||\//|| to||\//|| the||\//|| fill||\//|| pipe||\//|| of||\//|| the||\//|| non-compliant||\//|| UST||\//|| system: a.)||\//|| Three b.)||\//|| Five c.)||\//|| Seven d.)||\//|| Same||\//|| day||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| Seven CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2717.1(b) Automatic||\//|| line||\//|| leak||\//|| detectors||\//|| shall||\//|| be||\//|| installed||\//|| on||\//|| underground||\//|| pressurized||\//|| piping||\//|| with||\//|| secondary||\//|| containment||\//|| and||\//|| shall||\//|| be||\//|| capable||\//|| of||\//|| detecting||\//|| a: a.)||\//|| 3-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 5 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour. b.)||\//|| .1-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 5 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour. c.)||\//|| 3-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 10 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour. d.)||\//|| .1-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 10 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour.||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| 3-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 10 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour. CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(f)(2)(f)(3)||\//|| &||\//|| 2643(c)(1) Individuals||\//|| installing||\//|| an||\//|| Underground||\//|| Storage||\//|| Tank||\//|| System||\//|| shall||\//|| meet||\//|| all||\//|| of||\//|| the||\//|| following,||\//|| except: a.)||\//|| California||\//|| Licensed||\//|| Tank||\//|| Tester
b.)||\//|| Possess||\//|| the||\//|| appropriate||\//|| Contractors||\//|| State||\//|| License||\//|| Board||\//|| license. c.)||\//|| Effective||\//|| January||\//|| 1,||\//|| 2005,||\//|| the||\//|| individual||\//|| shall||\//|| possess||\//|| a||\//|| current||\//|| underground||\//|| storage||\//|| tank||\//|| system||\//|| installer||\//|| certificate||\//|| from||\//|| the||\//|| ICC||\//|| UST||\//|| Installation/Retrofitting||\//|| exam. d.)||\//|| The||\//|| individual||\//|| has||\//|| been||\//|| adequately||\//|| trained||\//|| as||\//|| evidenced||\//|| by||\//|| a||\//|| certificate||\//|| of||\//|| training||\//|| issued||\//|| by||\//|| the||\//|| manufacturer(s)||\//|| of||\//|| the||\//|| underground||\//|| storage||\//|| tank||\//|| system||\//|| component(s)||\//|| being||\//|| installed.||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| California||\//|| Licensed||\//|| Tank||\//|| Tester CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2715(g)(h) Which||\//|| of||\//|| the||\//|| following||\//|| would||\//|| not||\//|| require||\//|| secondary||\//|| containment||\//|| testing? a.)||\//|| Interstitial||\//|| space||\//|| hydrostatically||\//|| monitored b.)||\//|| Under-dispenser||\//|| containment c.)||\//|| Turbine||\//|| piping||\//|| sump d.)||\//|| Secondary||\//|| piping||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| Interstitial||\//|| space||\//|| hydrostatically||\//|| monitored CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2637(g) Local||\//|| agency||\//|| inspectors||\//|| performing||\//|| UST||\//|| system||\//|| inspections||\//|| must||\//|| meet||\//|| the||\//|| following||\//|| requirements:||\//|| which||\//|| of||\//|| the||\//|| following||\//|| statements||\//|| is||\//|| most||\//|| accurate. a.)||\//|| Effective||\//|| July||\//|| 1,||\//|| 2005 ||\//|| posses||\//|| a||\//|| current||\//|| inspector||\//|| certificate||\//|| issued||\//|| by||\//|| ICC||\//|| b.)||\//|| Renew||\//|| the||\//|| CA||\//|| UST||\//|| Inspector||\//|| Certification||\//|| every||\//|| 24 ||\//|| months||\//|| by||\//|| either||\//|| passing||\//|| the||\//|| ICC||\//|| Cal.||\//|| UST||\//|| Inspector||\//|| exam||\//|| of||\//|| satisfying||\//|| equivalent||\//|| criteria||\//|| as||\//|| approved||\//|| by||\//|| the||\//|| Board. c.)||\//|| Renew||\//|| the||\//|| CA||\//|| UST||\//|| Inspector||\//|| Certification||\//|| every||\//|| 24 ||\//|| months||\//|| by||\//|| passing||\//|| the||\//|| ICC||\//|| Cal.||\//|| UST||\//|| Inspector||\//|| exam d.)||\//|| Newly||\//|| hired||\//|| local||\//|| agency||\//|| inspectors||\//|| are||\//|| required||\//|| to||\//|| pass||\//|| the||\//|| CA||\//|| UST||\//|| Inspector||\//|| exam ||\//|| 120 ||\//|| days||\//|| from||\//|| the||\//|| date||\//|| of||\//|| hire.||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| Renew||\//|| the||\//|| CA||\//|| UST||\//|| Inspector||\//||
CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(a)(3) Automatic||\//|| line||\//|| leak||\//|| detectors||\//|| shall||\//|| be||\//|| installed||\//|| on||\//|| underground||\//|| pressurized||\//|| piping||\//|| and||\//|| shall||\//|| be||\//|| capable||\//|| of||\//|| detecting||\//|| a||\//|| 3-gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate||\//|| at||\//|| 10 ||\//|| psi||\//|| within||\//|| 1 ||\//|| hour||\//|| with||\//|| a||\//|| probability||\//|| of||\//|| detection||\//|| of||\//|| at||\//|| least||\//|| ______%||\//|| and||\//|| a||\//|| probability||\//|| of||\//|| false||\//|| alarm||\//|| no||\//|| greater||\//|| than||\//|| _______%. a.)||\//|| 95,||\//|| 5 b.)||\//|| 98,||\//|| 2 c.)||\//|| 5,||\//|| 95 d.)||\//|| 2,||\//|| 98 ||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| 95,||\//|| 5 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2636(f)(2)||\//|| &||\//|| 2643(c)(1) An||\//|| emergency||\//|| impact||\//|| valve||\//|| (shear||\//|| valve)||\//|| is||\//|| found||\//|| in||\//|| the||\//|| following||\//|| location||\//|| on||\//|| an||\//|| UST||\//|| System. a.)||\//|| At||\//|| the||\//|| turbine||\//|| piping||\//|| termination b.)||\//|| Base||\//|| of||\//|| the||\//|| dispenser c.)||\//|| Under||\//|| the||\//|| extractor||\//|| tee d.)||\//|| Spill||\//|| container||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| Base||\//|| of||\//|| the||\//|| dispenser Underground||\//|| storage||\//|| tank||\//|| owners||\//|| and||\//|| operators||\//|| shall||\//|| submit||\//|| a||\//|| copy||\//|| of||\//|| the||\//|| secondary||\//|| containment||\//|| test||\//|| report||\//|| to||\//|| the||\//|| local||\//|| agency||\//|| within||\//|| _____||\//|| of||\//|| the||\//|| completion||\//|| of||\//|| the||\//|| test, a.)||\//|| 60 ||\//|| days b.)||\//|| 30 ||\//|| days c.)||\//|| 45 ||\//|| days
d.)||\//|| 15 ||\//|| days||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| 30 ||\//|| days CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2637(e) Notification||\//|| to||\//|| perform||\//|| a||\//|| secondary||\//|| containment||\//|| test||\//|| must||\//|| be||\//|| given||\//|| to||\//|| the||\//|| local||\//|| agency||\//|| by: a.)||\//|| A||\//|| service||\//|| technician||\//|| or||\//|| a||\//|| licensed||\//|| tank||\//|| tester. b.)||\//|| Cathodic||\//|| protection||\//|| tester. c.)||\//|| Owner/operator||\//|| of||\//|| UST. d.)||\//|| State||\//|| Water||\//|| Resources||\//|| Control||\//|| Board.||\//|| - ||\//|| correct||\//|| answer✔✔c.)||\//|| Owner/operator||\//|| of||\//|| UST CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2637(f) A||\//|| tank||\//|| integrity||\//|| test||\//|| is||\//|| required||\//|| every||\//|| _____||\//|| when||\//|| statistical||\//|| inventory||\//|| reconciliation||\//|| is||\//|| used. a.)||\//|| 2 ||\//|| years b.)||\//|| Year c.)||\//|| 3 ||\//|| years d.)||\//|| Never||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| 2 ||\//|| years CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2643(b)(3) Once||\//|| a||\//|| UST||\//|| is||\//|| placed||\//|| into||\//|| temporary||\//|| closure,||\//|| it||\//|| shall||\//|| be||\//|| inspected||\//|| by||\//|| the||\//|| owner||\//|| or||\//|| operator||\//|| at||\//|| least||\//|| once||\//|| every||\//|| _____,||\//|| to||\//|| verify||\//|| that||\//|| the||\//|| temporary||\//|| closure||\//|| requirements||\//|| are||\//|| still||\//|| in||\//|| place.
d.)||\//|| 15 ||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| 30 CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2712(f) Any||\//|| person(s)||\//|| installing||\//|| underground||\//|| storage||\//|| tank||\//|| systems||\//|| or||\//|| components||\//|| shall||\//|| be||\//|| certified||\//|| or||\//|| licensed||\//|| by: a.)||\//|| The||\//|| Contractors||\//|| State||\//|| License||\//|| Board b.)||\//|| The||\//|| local||\//|| agency c.)||\//|| The||\//|| State||\//|| Water||\//|| Resources||\//|| Control||\//|| Board d.)||\//|| The||\//|| Regional||\//|| Water||\//|| Quality||\//|| Board||\//|| - ||\//|| correct||\//|| answer✔✔a.)||\//|| The||\//|| Contractors||\//|| State||\//|| License||\//|| Board CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2715(g) The||\//|| designated||\//|| UST||\//|| operator(s)||\//|| shall||\//|| perform||\//|| monthly||\//|| visual||\//|| inspections||\//|| of||\//|| all||\//|| UST's||\//|| for||\//|| which||\//|| they||\//|| are||\//|| designated.||\//|| The||\//|| monthly||\//|| visual||\//|| inspection||\//|| shall||\//|| include||\//|| all||\//|| of||\//|| the||\//|| following,||\//|| except: a.)||\//|| Inspecting||\//|| for||\//|| the||\//|| presence||\//|| of||\//|| hazardous||\//|| substances,||\//|| water,||\//|| or||\//|| debris||\//|| in||\//|| spill||\//|| containers. b.)||\//|| By||\//|| July||\//|| 1,||\//|| 2005,||\//|| verify||\//|| that||\//|| all||\//|| facility||\//|| employees||\//|| have||\//|| been||\//|| trained. c.)||\//|| Reviewing||\//|| the||\//|| alarm||\//|| history||\//|| report||\//|| or||\//|| log||\//|| for||\//|| the||\//|| previous||\//|| month. d.)||\//|| Inspecting||\//|| for||\//|| the||\//|| presence||\//|| of||\//|| hazardous||\//|| substances,||\//|| water,||\//|| or||\//|| debris||\//|| in||\//|| containment||\//|| sumps||\//|| regardless||\//|| of||\//|| documentation||\//|| showing||\//|| each||\//|| alarm||\//|| for||\//|| the||\//|| previous||\//|| month||\//|| has||\//|| been||\//|| responded||\//|| to||\//|| appropriately.||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| Inspecting||\//|| for||\//|| the||\//|| presence||\//|| of||\//|| hazardous||\//|| substances,||\//|| water,||\//|| or||\//|| debris||\//|| in||\//|| containment||\//|| sumps||\//|| regardless||\//|| of||\//|| documentation||\//|| showing||\//|| each||\//|| alarm||\//|| for||\//|| the||\//|| previous||\//|| month||\//|| has||\//|| been||\//|| responded||\//|| to||\//|| appropriately.
CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2715(c) The||\//|| following||\//|| statements||\//|| are||\//|| true||\//|| about||\//|| the||\//|| certification||\//|| of||\//|| monitoring||\//|| equipment,||\//|| except: a.)||\//|| The||\//|| certification||\//|| is||\//|| an||\//|| annual||\//|| requirement. b.)||\//|| The||\//|| certification||\//|| shall||\//|| be||\//|| made||\//|| on||\//|| a||\//|| "Monitoring||\//|| System||\//|| Certification"||\//|| form. c.)||\//|| UST||\//|| owners||\//|| and||\//|| operators||\//|| shall||\//|| submit||\//|| a||\//|| completed "Monitoring||\//|| System||\//|| Certification"||\//|| form||\//|| to||\//|| the||\//|| local||\//|| agency||\//|| within||\//|| 30 ||\//|| days||\//|| after||\//|| completion||\//|| of||\//|| the||\//|| inspection. d.)||\//|| The||\//|| "Monitoring||\//|| System||\//|| Certification"||\//|| form||\//|| must||\//|| be||\//|| posted.||\//|| - ||\//|| correct||\//|| answer✔✔d.)||\//|| The||\//|| "Monitoring||\//|| System||\//|| Certification"||\//|| form||\//|| must||\//|| be||\//|| posted. CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2638,||\//|| 2641(j) Field-installed||\//|| cathodic||\//|| protection||\//|| systems||\//|| shall||\//|| be||\//|| designed||\//|| and||\//|| certified||\//|| as||\//|| adequate||\//|| by ||\//|| a: a.)||\//|| Cathodic||\//|| protection||\//|| tester. b.)||\//|| A||\//|| corrosion||\//|| specialist. c.)||\//|| Owner/Operator. d.)||\//|| A||\//|| service||\//|| technician||\//|| or||\//|| a||\//|| licensed||\//|| tank||\//|| tester.||\//|| - ||\//|| correct||\//|| answer✔✔b.)||\//|| A||\//|| corrosion||\//|| specialist CCR||\//|| Title||\//|| 23,||\//|| Sec||\//|| 2635(a)(2)(A)