An exam for ust (underground storage tank) operators, complete with detailed solutions. It covers key aspects of ust operation, including automatic tank gauges, statistical inventory reconciliation, overfill prevention, leak detection, and cathodic protection. The exam questions address regulatory compliance, equipment testing, and emergency response procedures, providing a comprehensive review of essential knowledge for ust operators. It is useful for university students, high school students and lifelong learners.
Typology: Exams
1 / 20
This page cannot be seen from the preview
Don't miss anything!













An||\//|| Automatic||\//|| Tank||\//|| Gauge||\//|| consists||\//|| of A||\//|| console||\//|| inside||\//|| the||\//|| facility||\//|| and||\//|| a||\//|| probe||\//|| inside||\//|| the||\//|| tank When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| a||\//|| release||\//|| is||\//|| suspected||\//|| when||\//|| a||\//|| fail||\//|| result||\//|| is||\//|| given||\//|| for One||\//|| month How||\//|| often||\//|| must||\//|| overfill||\//|| and||\//|| spill||\//|| prevention||\//|| equipment||\//|| be||\//|| tested||\//|| to||\//|| ensure||\//|| operability? 3 ||\//|| Years Ball||\//|| Float||\//|| overfill||\//|| devices||\//|| cannot||\//|| be||\//|| replaced/repaired||\//|| or||\//|| installed? True
According||\//|| to||\//|| Tennessee||\//|| UST||\//|| rules,||\//|| a||\//|| suspected||\//|| or||\//|| confirmed||\//|| release||\//|| must||\//|| be||\//|| reported||\//|| to||\//|| the||\//|| Division||\//|| within||\//|| _____||\//|| of||\//|| its||\//|| discovery 72 ||\//|| Hours After||\//|| July||\//|| 24,||\//|| 2007 ||\//|| all||\//|| newly||\//|| installed||\//|| tanks||\//|| or||\//|| piping||\//|| must||\//|| use||\//|| this||\//|| form||\//|| of||\//|| leak||\//|| detection Interstitial||\//|| monitoring How||\//|| many||\//|| cathodic||\//|| protection||\//|| system||\//|| tests||\//|| must||\//|| be||\//|| kept||\//|| and||\//|| always||\//|| available||\//|| for||\//|| inspection?||\//|| (the||\//|| minimum||\//|| number||\//|| of||\//|| tests) the||\//|| last||\//|| two A||\//|| Class||\//|| A||\//|| Operator||\//|| is||\//|| one||\//|| who||\//|| typically Manages||\//|| recourcses/personnel,||\//|| establishes||\//|| work||\//|| assignments,||\//|| and||\//|| has||\//|| general||\//|| knowledge||\//|| of||\//|| facilities||\//|| and||\//|| its||\//|| requirements
the||\//|| remaining||\//|| life||\//|| of||\//|| the||\//|| UST||\//|| system T/F:||\//|| 15 ||\//|| days||\//|| prior||\//|| to||\//|| installing||\//|| a||\//|| new||\//|| UST||\//|| system||\//|| you||\//|| must||\//|| submit||\//|| a||\//|| pre-installation||\//|| notification||\//|| form True How||\//|| many||\//|| monthly||\//|| leak||\//|| detection||\//|| records||\//|| must||\//|| be||\//|| kept||\//|| and||\//|| always||\//|| available||\//|| for||\//|| inspection? The||\//|| last||\//|| 12 ||\//|| months T/F:||\//|| Temporarily||\//|| out||\//|| of||\//|| service||\//|| tanks||\//|| that||\//|| require||\//|| cathodic||\//|| protection||\//|| must||\//|| continue||\//|| to||\//|| operate||\//|| corrosion||\//|| protection||\//|| systems||\//|| as||\//|| long||\//|| as||\//|| the||\//|| tank||\//|| is||\//|| temporarily||\//|| out||\//|| of||\//|| service True T/F:||\//|| When||\//|| using||\//|| Interstitial||\//|| Monitoring||\//|| for||\//|| piping,||\//|| all||\//|| sumps||\//|| must||\//|| be||\//|| Integrity||\//|| tested||\//|| every||\//|| three||\//|| years||\//|| or||\//|| have||\//|| double||\//|| walled||\//|| sumps||\//|| with||\//|| continious||\//|| interstitial||\//|| sensors?
True When||\//|| a||\//|| spill||\//|| or||\//|| overfill||\//|| occurs||\//|| you||\//|| must||\//|| report||\//|| it||\//|| to||\//|| the||\//|| Division||\//|| if||\//|| it||\//|| is||\//|| over||\//|| ______||\//|| gallons,||\//|| or||\//|| if||\//|| it||\//|| is||\//|| less||\//|| than||\//|| this||\//|| amount||\//|| and||\//|| cannot||\//|| be||\//|| cleaned||\//|| up||\//|| within||\//|| 24 ||\//|| hours 25 ||\//|| gallons How||\//|| long||\//|| must||\//|| Release||\//|| Detection||\//|| Operability||\//|| Tests||\//|| be||\//|| maintained?||\//|| (ie.||\//|| Automatic||\//|| Tank ||\//|| Gauging,||\//|| Probes||\//|| and||\//|| Sensors,||\//|| Automatic||\//|| Line||\//|| Leak||\//|| Detector,||\//|| Vacuum||\//|| pumps||\//|| and||\//|| pressure||\//|| gauges) 3 ||\//|| Years T/F:||\//|| TOS||\//|| tanks||\//|| containing||\//|| less||\//|| than||\//|| one||\//|| inch||\//|| of||\//|| residue||\//|| must||\//|| conduct||\//|| 3 ||\//|| year||\//|| testing||\//|| of||\//|| the||\//|| spill||\//|| and||\//|| overfill||\//|| devices? False Sump||\//|| integrity||\//|| testing||\//|| must||\//|| be||\//|| kept||\//|| for
Stop||\//|| the||\//|| release||\//|| as||\//|| soon||\//|| as||\//|| possible||\//|| and||\//|| contain||\//|| the||\//|| relase,||\//|| notify||\//|| local||\//|| emergency||\//|| response||\//|| personnel||\//|| if||\//|| necessary,||\//|| and||\//|| notify||\//|| the||\//|| Tennessee||\//|| Division||\//|| of||\//|| Underground||\//|| Storage||\//|| Tanks How||\//|| many||\//|| monthly||\//|| walkthrough||\//|| records||\//|| are||\//|| required||\//|| to||\//|| be||\//|| kept? 12 How||\//|| often||\//|| must||\//|| mechanical||\//|| automatic||\//|| line||\//|| leak||\//|| detectors||\//|| be||\//|| tested? Annually Temporarily||\//|| out||\//|| of||\//|| service||\//|| (TOS)||\//|| tanks||\//|| require||\//|| a||\//|| new||\//|| notification||\//|| form||\//|| to||\//|| be||\//|| submitted||\//|| with||\//|| the||\//|| new||\//|| status Within||\//|| 30 ||\//|| days||\//|| of||\//|| taking||\//|| the||\//|| tank||\//|| TOS T/F:||\//|| When||\//|| repairing||\//|| piping||\//|| you||\//|| do||\//|| not||\//|| have||\//|| to||\//|| inform||\//|| the||\//|| Division
False How||\//|| long||\//|| must||\//|| spill||\//|| bucket||\//|| integrity||\//|| and||\//|| overfill||\//|| equipment||\//|| operability||\//|| tests||\//|| be||\//|| kept 3 ||\//|| Years T/F:||\//|| All||\//|| UST||\//|| facilities||\//|| currently||\//|| in||\//|| use||\//|| are||\//|| required||\//|| to||\//|| do||\//|| monthly||\//|| and||\//|| annual||\//|| walkthroughs True As||\//|| a||\//|| Class||\//|| B||\//|| Operator||\//|| you||\//|| must Have||\//|| a||\//|| trained||\//|| Class||\//|| C||\//|| Operator||\//|| at||\//|| manned||\//|| facilities||\//|| at||\//|| all||\//|| times What||\//|| is||\//|| required||\//|| to||\//|| be||\//|| checked||\//|| during||\//|| a||\//|| monthly||\//|| walkthrough? Spill||\//|| prevention||\//|| and||\//|| release||\//|| detection||\//|| equipment
What||\//|| are||\//|| the||\//|| three||\//|| most||\//|| common||\//|| means||\//|| of||\//|| overfill||\//|| protection? Automatic||\//|| shutoff||\//|| devices,||\//|| overfill||\//|| alarms,||\//|| and||\//|| ball||\//|| float||\//|| valves An||\//|| overfill||\//|| device||\//|| is||\//|| designed||\//|| to stop||\//|| product||\//|| flow,||\//|| reduce||\//|| product||\//|| flow,||\//|| or||\//|| alert||\//|| the||\//|| delivery||\//|| person||\//|| before||\//|| the||\//|| tank||\//|| becomes||\//|| full||\//|| and||\//|| begins||\//|| releasing||\//|| product||\//|| into||\//|| the||\//|| environment How||\//|| often||\//|| are||\//|| you||\//|| required||\//|| to||\//|| check||\//|| spill||\//|| buckets||\//|| and||\//|| record||\//|| your||\//|| observation? Every||\//|| 30 ||\//|| days Spill||\//|| prevention||\//|| must||\//|| be||\//|| periodically||\//|| checked: for||\//|| signs||\//|| of||\//|| wears/cracks/holes,||\//|| to||\//|| make||\//|| sure||\//|| liquid||\//|| and||\//|| debris||\//|| are||\//|| not||\//|| preventing||\//|| it||\//|| from ||\//|| holding||\//|| liquid,||\//|| and||\//|| to||\//|| see||\//|| if||\//|| it||\//|| will||\//|| hold||\//|| liquid How||\//|| often||\//|| must||\//|| overfill||\//|| prevention||\//|| equipment||\//|| be||\//|| tested||\//|| to||\//|| ensure||\//|| operability?
3 ||\//|| Years How||\//|| often||\//|| is||\//|| spill||\//|| prevention||\//|| equipment||\//|| required||\//|| to||\//|| be||\//|| integrity||\//|| tested? 3 ||\//|| Years If||\//|| suction||\//|| piping||\//|| is||\//|| sloped||\//|| back||\//|| to||\//|| the||\//|| tank||\//|| and||\//|| has||\//|| only||\//|| one||\//|| check||\//|| valve||\//|| located||\//|| at||\//|| the||\//|| dispenser there||\//|| is||\//|| no||\//|| release||\//|| detection||\//|| required||\//|| on||\//|| this||\//|| section||\//|| of||\//|| piping T/F:||\//|| When||\//|| using||\//|| interstitial||\//|| monitoring||\//|| all||\//|| sensors||\//|| alarms||\//|| must||\//|| be||\//|| properly||\//|| investigated ||\//|| and||\//|| documented True When||\//|| using||\//|| Automatic||\//|| Tank||\//|| Gauging||\//|| for||\//|| monthly||\//|| monitoring,||\//|| it||\//|| is||\//|| best||\//|| if||\//|| monthly||\//|| leak||\//|| test||\//|| results||\//|| are||\//|| printed||\//|| out:
False T/F:||\//|| When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| a||\//|| suspected||\//|| release||\//|| must||\//|| be||\//|| reported||\//|| if||\//|| a||\//|| tank||\//|| receives||\//|| two||\//|| consecutive||\//|| monthly||\//|| inconclusive||\//|| results True For||\//|| monthly||\//|| monitoring,||\//|| an||\//|| Automatic||\//|| Tank||\//|| Gauge||\//|| must||\//|| be||\//|| able||\//|| to||\//|| detect||\//|| a||\//|| ______||\//|| gallon||\//|| per||\//|| hour||\//|| leak||\//|| rate 0.2||\//|| According||\//|| to||\//|| the||\//|| UST||\//|| rules,||\//|| when||\//|| using||\//|| Interstitial||\//|| Monitoring||\//|| with||\//|| double-walled||\//|| tanks,||\//|| the||\//|| monitoring||\//|| system||\//|| must||\//|| be||\//|| capable||\//|| of||\//|| detecting||\//|| a||\//|| release||\//|| through the||\//|| inner||\//|| tank||\//|| wall T/F:||\//|| When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| leak||\//|| detection||\//|| results||\//|| as||\//|| well||\//|| as||\//|| raw||\//|| data||\//|| must||\//|| be||\//|| available||\//|| for||\//|| inspection
True If||\//|| you||\//|| have||\//|| no||\//|| monthly||\//|| Automatic||\//|| Tank||\//|| Gauge||\//|| result||\//|| near||\//|| the||\//|| end||\//|| of||\//|| a||\//|| 30-day||\//|| period||\//|| it||\//|| would||\//|| be||\//|| a||\//|| good||\//|| idea||\//|| to____________ Take||\//|| the||\//|| tank||\//|| out||\//|| of||\//|| service||\//|| and||\//|| conduct||\//|| a||\//|| static||\//|| automatic||\//|| tank||\//|| gauge||\//|| test||\//|| before||\//|| the||\//|| 30-day||\//|| period||\//|| ends When||\//|| using||\//|| Manual||\//|| Tank||\//|| Gauging,||\//|| a||\//|| release||\//|| is||\//|| suspected||\//|| if||\//|| the||\//|| difference||\//|| between||\//|| the||\//|| beginning||\//|| and||\//|| ending||\//|| measurements||\//|| exceed||\//|| the||\//|| weekly||\//|| or||\//|| monthly||\//|| standards given||\//|| for||\//|| the||\//|| specific||\//|| tank||\//|| size T/F:||\//|| Automatic||\//|| Tank||\//|| Gauges||\//|| can||\//|| perform||\//|| valid||\//|| leak||\//|| detection||\//|| tests||\//|| with||\//|| any||\//|| amount||\//|| of ||\//|| product||\//|| in||\//|| the||\//|| tank False
When||\//|| using||\//|| Manual||\//|| Tank||\//|| Gauging,||\//|| the||\//|| test||\//|| period||\//|| (time||\//|| needed||\//|| between||\//|| beginning||\//|| and||\//|| ending||\//|| reading)||\//|| depends||\//|| on the||\//|| tank||\//|| size When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| the||\//|| volume||\//|| in||\//|| each||\//|| tank||\//|| must||\//|| be||\//|| measured||\//|| before||\//|| and||\//|| after||\//|| ___________||\//|| by||\//|| either||\//|| a||\//|| gauging||\//|| stick||\//|| or||\//|| by||\//|| using||\//|| an||\//|| ATG each||\//|| delivery When||\//|| using||\//|| interstitial||\//|| monitoring||\//|| a||\//|| release||\//|| is||\//|| suspected||\//|| when a||\//|| sensor||\//|| detects||\//|| a||\//|| leak||\//|| in||\//|| the||\//|| annular||\//|| space||\//|| or||\//|| in||\//|| the||\//|| sump When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| what||\//|| needs||\//|| to||\//|| be||\//|| recorded||\//|| either||\//|| by||\//|| hand||\//|| or||\//|| with||\//|| an||\//|| ATG||\//|| each||\//|| day amount||\//|| of||\//|| product||\//|| left||\//|| in||\//|| the||\//|| tank||\//|| after||\//|| daily||\//|| sales||\//|| (inventory),||\//|| any||\//|| product||\//|| placed||\//|| in||\//|| the||\//|| tank||\//|| (deliveries),||\//|| and||\//|| any||\//|| product||\//|| pumped||\//|| from||\//|| the||\//|| tank||\//|| (sales)
Manual||\//|| Tank||\//|| Gauging||\//|| may||\//|| only||\//|| be||\//|| used||\//|| for||\//|| release||\//|| detection on||\//|| tanks||\//|| that||\//|| are||\//|| 2,000||\//|| gallons||\//|| or||\//|| smaller The||\//|| space||\//|| between||\//|| two||\//|| walls||\//|| of||\//|| a||\//|| double||\//|| wall||\//|| tank||\//|| is||\//|| called the||\//|| interstitial||\//|| (or||\//|| annular)||\//|| space When||\//|| using||\//|| Statistical||\//|| Inventory||\//|| Reconciliation,||\//|| what||\//|| could||\//|| be||\//|| the||\//|| reason||\//|| for||\//|| an||\//|| inconclusive||\//|| SIR||\//|| result||\//|| except meter||\//|| not||\//|| correctly||\//|| calibrated,||\//|| using||\//|| incorrect||\//|| tank||\//|| chart,||\//|| or||\//|| missing||\//|| delivery||\//|| or||\//|| sales||\//|| readings Interstitial||\//|| Monitoring||\//|| does||\//|| not||\//|| utilize Inventory||\//|| control
How||\//|| many||\//|| cathodic||\//|| protection||\//|| rectifier||\//|| inspection||\//|| readings||\//|| must||\//|| be||\//|| kept||\//|| and||\//|| always||\//|| available||\//|| for||\//|| inspection?||\//|| (the||\//|| minimum||\//|| number||\//|| of||\//|| readings) the||\//|| last||\//|| three Repaired||\//|| cathodic||\//|| protection||\//|| systems||\//|| must||\//|| have||\//|| a||\//|| cathodic||\//|| protection||\//|| system||\//|| test||\//|| performed||\//|| within||\//|| ______||\//|| of||\//|| the||\//|| repair 6 ||\//|| months a||\//|| tank||\//|| or||\//|| piping||\//|| system||\//|| with||\//|| Sacrificial||\//|| Anode||\//|| (galvanic)||\//|| cathodic||\//|| protection||\//|| is||\//|| required||\//|| to||\//|| have||\//|| a||\//|| cathodic||\//|| protection||\//|| system||\//|| test At||\//|| least||\//|| once||\//|| every||\//|| 3 ||\//|| years How||\//|| soon||\//|| after||\//|| a||\//|| cathodic||\//|| protection||\//|| system||\//|| has||\//|| been||\//|| repaired||\//|| should||\//|| a||\//|| tank||\//|| tightness||\//|| test||\//|| be||\//|| performed 3-6||\//|| months
When||\//|| an||\//|| impressed||\//|| current||\//|| cathodic||\//|| protection||\//|| system||\//|| is||\//|| used||\//|| for||\//|| steel||\//|| tanks||\//|| and||\//|| piping,||\//|| the||\//|| rectifier must||\//|| be||\//|| on||\//|| continually T/F:||\//|| All||\//|| UST||\//|| facilities||\//|| currently||\//|| in||\//|| use||\//|| are||\//|| required||\//|| to||\//|| do||\//|| monthly||\//|| and||\//|| annual||\//|| walkthroughs? True