An overview of the masterformat system, which is a standardized format for organizing construction specifications and project information. It covers the purpose of masterformat, the components of integrated project delivery, the structure and organization of outline specifications, the role of submittal requirements, the conditions of the contract, and the use of proprietary specifications and substitutions. The document also discusses the application of life cycle analysis, the flexibility of specification section numbering, the contents of the 'available information' document, and the use of addenda and change orders in construction projects. Overall, this document offers valuable insights into the key principles and practices related to construction specifications and project management.
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!










a) for scheduling, value management, recording of design data and managing costs. b) used during the planning stage of a project. c) to organize the Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need for information to appear upon each page of a project manual. - CORRECT ANSWER-c) to organize the Project Manual, reference keynotes and detailed cost estimates.
a) Increased coordination of construction documentation. b) Desire Greater prefabrication opportunities. c) Optimized site utilization. d) All of the above. - CORRECT ANSWER-d) All of the above.
d) Technologies such as data exchange protocols evolve on a phase-by-phase basis. - CORRECT ANSWER-a) Mutual benefit and reward, and because of early involvement, compensation based on the value added and what's best for the project.
c) Division 01. d) Specifications Sections. - CORRECT ANSWER-c) Division 01.
c) On Architect/Engineer's recommendation d) When stipulated in the Owner-Contractor Agreement. - CORRECT ANSWER-d) When stipulated in the Owner-Contractor Agreement.
a) Extent of work cannot be fully determined or where actual quantities cannot be accurately calculated. b) Extent of work is known, but the Owner desires a unit cost for portions of the work. c) It is anticipated that bidders will not examine soil bearing reports prior to submitting bid. d) Bidding quantities of equipment. - CORRECT ANSWER-a) Extent of work cannot be fully determined or where actual quantities cannot be accurately calculated.