Project Management is the art of maximizing the probability that a project delivers its goals on Time, to Budget and at the required Quality. This lecture handout was provided by Sir Debashis Koppale. It includes: Software, Project, Managment, Quality, Review, Concise, Element, Responsibility, Work, Breakdown, Structure
Typology: Study notes
1 / 6
This page cannot be seen from the preview
Don't miss anything!




7.4 WBS- A Mandatory Management Tool
h) Characteristics of a High-Quality WBS
a) Review and signoff from top to bottom
b) Includes logical flow and is hierarchical in nature
c) Clear and concise
d) Provides ability to roll-up information to higher levels
e) Receives 100% team buy-in
f) Should have at least 2 levels: Level 1 defines 100% of the service/product/result; Level 2 defines the deliverables in terms of work (groupings)
g) Project Management (and sub-contract management) at Level 2.
h) The deliverables in the WBS must match the scope or contract (WBS should not contain work that is not defined in the scope – Scope should not describe work not contained in the WBS)
i) All deliverables should be accounted for regardless of responsibility
j) Every WBS element should be clearly defined – or should be clarified in the WBS Dictionary
k) Features
l) Usefulness
m) WBS Is Not
i) Types of WBS
The two types of Work Breakdown Structures are:
a) Program Work Breakdown Structures
b) Contract Work Breakdown Structures
a) Contract WBS
A Contract WBS extends the Program WBS to a lower level in order to provide management and cost information to the Government. It includes all the elements for products (e.g., hardware, software, data, or services) that are the responsibility of the contractor. It must be consistent with the Program WBS.
Typically, a Program WBS consists of the upper three levels.
WBS Level 1: The entire defense materiel item.
WBS Level 2: Major elements of the defense materiel item, which are subordinate to Level 1.
WBS Level 3: Elements subordinate to Level 2 elements.
j) Sample WBS
What About?
Sample 1: A Product WBS
WBS Sample 2: System Development Projects
Project
Hardware
Software
System Engr
Project Mgt
System Test
Data Mgt
Level 5
Level 3
Level 4