Capm exam cheat sheet
Supportive PMO correct answer Provide consulting by supplying templates, best practices,
coaching/training
Controlling PMO correct answer Provide support and require compliance to standards
Directive PMO correct answer Take control of projects by directly managing them
Mitigate correct answer Reduce the probability of occurrence or impact of risk
Prevention (cost of conformance) correct answer Design and build quality products (e.g.
training, equipment, and process documents)
Appraisal (cost of conformance) correct answer Assess quality (e.g. inspection and testing)
5.1 You find that a rejected change request was implemented by the project team, who knew of
the change request but not of the rejection. In order to avoid such a situation, rejected change
requests should be consistently communicated to stakeholders through which process? correct
answer Perform Integrated Change Control
5.10) A change is identified in order to bring future performance in line with the project
Management plan. This is known as __________ correct answer Ans: Preventive action
5.18) Your project sponsor has emphasized the need for cost controls. To address these
concerns, you should provide: correct answer Earned Value Performance Measurements
Behaviors of a product (e.g. process an order) correct answer Functional
Conditions that support those behaviors (e.g. security, performance) correct answer Non-
Functional
pf2

Partial preview of the text

Download Capm examination cheat sheet paper and more Exams Business Ethics in PDF only on Docsity!

Capm exam cheat sheet Supportive PMO correct answer Provide consulting by supplying templates, best practices, coaching/training Controlling PMO correct answer Provide support and require compliance to standards Directive PMO correct answer Take control of projects by directly managing them Mitigate correct answer Reduce the probability of occurrence or impact of risk Prevention (cost of conformance) correct answer Design and build quality products (e.g. training, equipment, and process documents) Appraisal (cost of conformance) correct answer Assess quality (e.g. inspection and testing) 5.1 You find that a rejected change request was implemented by the project team, who knew of the change request but not of the rejection. In order to avoid such a situation, rejected change requests should be consistently communicated to stakeholders through which process? correct answer Perform Integrated Change Control 5.10) A change is identified in order to bring future performance in line with the project Management plan. This is known as __________ correct answer Ans: Preventive action 5.18) Your project sponsor has emphasized the need for cost controls. To address these concerns, you should provide: correct answer Earned Value Performance Measurements Behaviors of a product (e.g. process an order) correct answer Functional Conditions that support those behaviors (e.g. security, performance) correct answer Non- Functional

5.37) Which of the following is conducted to identify inefficient and ineffective policies and procedures used by a project? A.)Quality Audit B.)Quality Inspection C.)Quality Benchmarking D.)Quality Control correct answer Ans: Quality Audit 5.41)After reading customer reviews of a competitors product, a key stakeholder requests that additional performance tests be performed prior to market launch. This represents a change to: A.)Product Scope B.)Project Scope correct answer Ans: Project Scope B 5.44)A Break-Even point is presented in the Business Case. You define how this will be achieved and measured in the: A.)Cost management plan B.)Statement of Work C.)Project Management Plan D.)Project Benefits Management Plan correct answer Ans: D.)Project Benefits Management Plan