A set of practice questions and solutions related to the pjm (pennsylvania-new jersey-maryland) generation dispatcher exam. It covers key concepts such as voltage regulation, generator limits, synchronization procedures, geomagnetic disturbance protocols, terrorism advisory alerts, and emergency procedures. The questions address real-time operating scenarios, reactive power management, outage management, and restoration processes. It is useful for those preparing for the pjm generation dispatcher exam, offering insights into the operational aspects of power grid management and regulatory compliance. It also covers topics such as voltage/reactive power schedule, operating reserves, and frequency control.
Typology: Exams
1 / 6
This page cannot be seen from the preview
Don't miss anything!




1 /
excitation current, you change the voltage.
Limits
Voltage, and phase angle.
measured by special equipment at Missouri Ave or Meadowbrook and the measurement is confirmed by one of the following other sources: Excess transformer current @ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick or Peach Bottom.
Conservative Operations
and Communications
2 /
at the lower bandwidth of the voltage schedule.
Status Report
Units which are units that are not able to run at max capacity for more than 72 hours.
1.008 pu
Min is 75?: Eco Min - Emerg Min = 25MW
must notify PJM when it reaches that level.
(synchronized) reserves
w/in 10 min or?: Reduction in load from a synchronized resource w/in 10 min.
4 /
(quick start), and supplemental reserves (secondary)
automatic control to provide what?: Correction for small deviations in load.
5 /
following Mon morning at 0800?: Maintenance outage
: 9 days
: Unlimited
temperature decreases.
power capability test at one time?: 100 MVAR
than 3 business days prior to the test.
: Cranking power for combustion turbines.