









Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
PURE CERTIFIED FLASHARRAY STORAGE PROFESSIONAL 2026 DATA SCRIPT SOLVED QUESTIONS VERIFIED ANSWERS A+
Typology: Exams
1 / 15
This page cannot be seen from the preview
Don't miss anything!










โ Chassis. Answer: Main structure housing FlashArray components. โ Power Supplies. Answer: Devices providing electrical power to FlashArray. โ Controllers. Answer: Manage data flow and operations in FlashArray. โ Network Ports. Answer: Connect FlashArray to network for data transfer. โ Mezzanine Card. Answer: Expansion card for additional connectivity options. โ NVRAM. Answer: Non-volatile memory for data caching in FlashArray.
โ FlashModules. Answer: Storage modules used in FlashArray for data. โ Site Planning. Answer: Preparation for equipment installation and setup. โ Rack Depth. Answer: Minimum space required for FlashArray installation. โ RU Requirements. Answer: Rack Unit specifications for FlashArray placement. โ Capacity Addition. Answer: Process of increasing storage capacity in FlashArray. โ Controller NDU. Answer: Non-Disruptive Upgrade for FlashArray controllers. โ Capacity Consolidation. Answer: Combining storage resources for efficiency. โ DirectFlash Modules. Answer: High-performance storage modules for FlashArray.
Answer: Storage shelf supporting DirectFlash technology. โ 240 VAC. Answer: Preferred voltage for FlashArray installations. โ Shipping Carton Dimensions. Answer: 94 cm x 62 cm x 51 cm for FlashArray. โ Item Codes. Answer: Identifiers for specific FlashArray configurations. โ Network Connection Types. Answer: Different methods for connecting FlashArray to networks. โ Power Requirements. Answer: Specifications for electrical supply to FlashArray. โ PDU. Answer: Power Distribution Unit for circuit management. โ Management Cables. Answer: 2 x 1GbE cables for controller management.
โ FC Connectivity. Answer: Minimum 8 x 16Gb connections for data transfer. โ SMTP Relay. Answer: Configured for alert emails from management IPs. โ HTTPS/443. Answer: Outbound access for RemoteAssist and Pure1. โ CallHome. Answer: Feature for automatic support notifications. โ RemoteAssist. Answer: Remote support tool for troubleshooting. โ Replication. Answer: Requires open ports 8117 and 443 for interfaces. โ Install Worksheet. Answer: Document outlining installation requirements. โ Site Readiness. Answer: Assessment of site conditions before installation.
Answer: Configuration for serial communication with controllers. โ puresetup User. Answer: User for initial setup and configuration tasks. โ USB Drive. Answer: Storage for Purity code and installation files. โ Mounting USB Drive. Answer: Process for accessing files on USB in Linux. โ Copy Files. Answer: Transferring installation files to controller directory. โ pureinstall Command. Answer: Command to install new version of Purity. โ Controller Configuration. Answer: Setup process for primary and secondary controllers. โ Baud Rate. Answer: 115,200 for serial communication settings.
โ Installation Agenda. Answer: Step-by-step plan for FlashArray installation. โ Test Runs. Answer: Automatic checks for system health post-installation. โ Verify Configuration. Answer: Ensure correct settings after installation. โ Reboot Controller. Answer: Restart process to apply new configurations. โ Proxy Server Format. Answer: http(s)://hostname:port for proxy configuration. โ Username Requirement. Answer: @username indicates a required username for access. โ Valid Array Name. Answer: Alphanumeric, 1-56 characters, case insensitive. โ Change Time Zone Command. Answer: Use CLI command 'puresetup timezone' for adjustments.
Answer: Ensure Phone Home and RA functionalities are operational. โ Network Ping Command. Answer: Use 'purenetwork eth ping --ct0.eth0 10.1.1.1'. โ IO Port Connection Requirement. Answer: Hosts need redundant connections to CT1 and CT0. โ Ethernet Subnets Creation. Answer: Set attributes for iSCSI, replication, or file. โ Host Groups Creation. Answer: Create host groups in GUI under Storage > Hosts. โ Volume Creation. Answer: Create volumes in GUI under Storage > Volumes. โ Protection Groups. Answer: Create P Groups in GUI under Protection > Protection Groups. โ Connection Key Retrieval. Answer: Get connection key from Protection > Array > Array Connections.
โ Replication IP Requirement. Answer: Replication requires 1 IP per array. โ Active Cluster IP Requirement. Answer: Requires 4 replication IPs and 5 management IPs. โ Email Notifications. Answer: Sent to Alert Watchers defined in GUI settings. โ Host Balance Check Command. Answer: Use 'purehost monitor --balance' to check balance. โ Change User Password Command. Answer: Use 'pureadmin setattr --password pureuser' command. โ DirectFlash Shelf Capacity. Answer: Supports 15TB, 31TB, 63TB, 127TB, 256TB packs. โ Shelf Connection Types. Answer: Mezzanine can be either Ethernet or SAS. โ Shelf Cabling Requirement.
โ Pureeng User. Answer: Dynamic root for accessing the array. โ Pureuser Limitations. Answer: Cannot execute NDU commands. โ PCIe Card Movement. Answer: Restrictions exist based on controller generations. โ Purearray List Command. Answer: Check controller code version and readiness. โ Suppress Alerts Command. Answer: Use purealert tag to suppress alerts. โ IO Balance Command. Answer: Check IO balance with iobalance command. โ CT0 Replacement Steps. Answer: Includes stopping Purity and removing cables. โ Admit New CT0 Command. Answer: Use puresetup to replace controller.
โ Final Commands After Evacuation. Answer: Support runs commands post-removal of storage. โ Evacuation Process Duration. Answer: Evacuation can take two or more days. โ Health Checks by Support. Answer: Support checks Purity version and capacity. โ Remote Access Session. Answer: Initiated by Support during evacuation. โ Cabling for Direct Flash Shelves. Answer: Available in 1, 3, and 5 meter lengths. โ Power Supply Swap. Answer: Larger supplies swapped during NDU process. โ Support Case Timing. Answer: Open cases well in advance of work. โ Post NDU Health Checks.