Sessional-1 (SPM-2020), Exams of Software Project Management

It will be useful for students preparing for their Software Project Management Exam.

Typology: Exams

2019/2020

Available from 10/30/2021

HarisKiani
HarisKiani 🇵🇰

6 documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
COMSATS University Islamabad (CUI), Islamabad Campus
Computer Science Department
Sessional 1 Examination – Fall 2020
Class/Section: BSE – 6 – A|B|C Date: Oct 20, 2020
Course Code/Subject: CSC494 / CSE494
Software Project Management
Time Allowed: 45 Minutes
Instructors: Mr. Ahmad
Mr. Muzaffar Iqbal
Ms. Ismaul Hassan
Marks: Part A = 10
Part B = 20
Total = 30
NAME: Haris Kayani REG#: SP18-BSE-062
Instructions
Attempt all questions, avoid unnecessary details and utilize your time effectively and efficiently.
Write your Name and Registration Number on top of each paper.
Zero Tolerance Policy in case of cheating from either slides, internet sources or your peers.
Part B
Question 2 CLO-2, CLO-4 20 Marks
Each part carries equal marks
Most of the educational institutions around the globe have gone online due to the COVID-19 pandemic
situation. Delivering lectures and taking notes is relatively easy task during online education but for most
of the people involved in online education, either faculty members or students, are facing extreme
challenges when it comes to online assessments. Suppose that you work as a project manager in the IT-
upgraded educational institution, and the head of institution asked you to initiate a project for Online
Learning Management System which should be better than the existing solutions. Assume that the
project will take 8 months to complete and the budget allocated for the said project is PKR 5 Million. In
the light of discussed case study, you are required to do the following:
a) Develop a Project Charter for Online Learning Management System. (CLO-4)
b) As your project is initiated, now you have to collect requirements for the project. You are required
to document at least four technical and four non-technical requirements in the Requirement
Traceability Matrix.
(CLO-2)
c) Write a Project Scope Statement for the said project. You should be as specific as possible in
describing product characteristics and requirements, as well as all the project’s deliverables.
(CLO-2)
d) Develop a Work Breakdown Structure. Work can be broken down to level 3 or level 4 as you deem
appropriate. Make sure that the WBS is based on the Project Charter, Scope Statement, and other
relevant information. (CLO-2)
pf3
pf4

Partial preview of the text

Download Sessional-1 (SPM-2020) and more Exams Software Project Management in PDF only on Docsity!

COMSATS University Islamabad (CUI), Islamabad Campus

Computer Science Department Sessional 1 Examination – Fall 2020 Class/Section: BSE – 6 – A|B|C Date: Oct 20, 2020 Course Code/Subject: CSC494 / CSE Software Project Management Time Allowed: 45 Minutes Instructors: Mr. Ahmad Mr. Muzaffar Iqbal Ms. Ismaul Hassan Marks: Part A = 10 Part B = 20 Total = 30 NAME: Haris Kayani REG#: SP18-BSE- InstructionsAttempt all questions, avoid unnecessary details and utilize your time effectively and efficiently.Write your Name and Registration Number on top of each paper.Zero Tolerance Policy in case of cheating from either slides, internet sources or your peers. Part B

Question 2 CLO-2, CLO-4 20 Marks

Each part carries equal marks Most of the educational institutions around the globe have gone online due to the COVID-19 pandemic situation. Delivering lectures and taking notes is relatively easy task during online education but for most of the people involved in online education, either faculty members or students, are facing extreme challenges when it comes to online assessments. Suppose that you work as a project manager in the IT- upgraded educational institution, and the head of institution asked you to initiate a project for Online Learning Management System which should be better than the existing solutions. Assume that the project will take 8 months to complete and the budget allocated for the said project is PKR 5 Million. In the light of discussed case study, you are required to do the following: a) Develop a Project Charter for Online Learning Management System. (CLO-4) b) As your project is initiated, now you have to collect requirements for the project. You are required to document at least four technical and four non-technical requirements in the Requirement Traceability Matrix. (CLO-2) c) Write a Project Scope Statement for the said project. You should be as specific as possible in describing product characteristics and requirements, as well as all the project’s deliverables. (CLO-2) d) Develop a Work Breakdown Structure. Work can be broken down to level 3 or level 4 as you deem appropriate. Make sure that the WBS is based on the Project Charter, Scope Statement, and other relevant information. (CLO-2)

Solution (a) Project Title : E Learning Sytem Authorization Date : 10/23/ Start : 10/23/20 End : 6/23/ Description The Main Driver or motivation for this project is the Pandemic and the Problems it comes with. The Purpose for such a Project is to produce Well managed and easy to understand Online Learning Platform for the students. Bugdet Information Assigned 5 Million Pkr for the Project Project Manager Haris Kayani Email Address : [email protected] 0335527201 Project Objective To Produce such a Software Which is Responsive,Safe to User and has an extra element of usability. Approach  Hire Some Expert Programmers and SQL Masters  Setup all the hardware and software required to undertake this project  By Using the Team develop WBS for this Project and assign the Components to the experts of hired team  Conduct Monthly Testing On all components and deliverables Roles and Responsibilities Haris Kayani Project Manager CEO Zouqe Khuda Project Lead Programmer Qasim Khan Programmer Programmer Ahmed Ali SQA Expert Team Member Muhammad Tester Hired Personnel

Solution (c) Characterstics : Speed,Ease of Use,Robustness,Reliabilty,Safety and Portabilty. Requirements : OS like Mac,Linus ,Windows , Andriod and IOS only,Stable Connection, Learning System Installed on Device. Deliverables : Login/Logout, Check Marks , Assign Marks , Start-Meeting/End Meeting/Join Meeting , Start a Conversation, Assign a Specific Task. Solution (d)

  1. Online Teaching System 1.1 Planning 1.1.1 Requirement gathering 1.1.2 Scheduling of Timetable 1.2 Database 1.3 Development of Content 1.3.1 User Interface Development 1.3.1.1 Consistency and Architecture Design 1.3.2 Navigation Arrows 1.4 Testing 1.4.1 User Testing 1.4.2 Security Testing 1.4.3 Debugging 1.4.4 Cohesion and Consistency Check 1.5 Technical Selection 1.5.1.1 Server Selection 1.5.1.2 Domain Selection 1.5.1.3 Technical Standards