









Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
This is assignments of software engineering.this can be help to developed your skills
Typology: Assignments
1 / 16
This page cannot be seen from the preview
Don't miss anything!










Programme title BTEC^ HND in Computing Assessor Internal Verifier Unit(s) Unit 06: Managing a Successful Computing Project Assignment title Managing a Project on the environmental impact of digital transformation Student’s name List which assessment criteria the Assessor has awarded. Pass Merit Distinction INTERNAL VERIFIER CHECKLIST Do the assessment criteria awarded match those shown in the assignment brief? Y/N Is the Pass/Merit/Distinction grade awarded justified by the assessor’s comments on the student work? Y/N Has the work been assessed accurately? Y/N Is the feedback to the student: Give details:
Programme Leader signature (if required) Date
Student Declaration I hereby, declare that I know what plagiarism entails, namely to use another’s work and to present it as my own without attributing the sources in the correct way. I further understand what it means to copy another’s work.
Grading Rubric Grading Criteria Achieved Feedback LO1 Establish project aims, objectives and timeframes based on the chosen theme P1 Devise project aims and objectives for a chosen scenario. P2 Produce a project management plan that covers aspects of cost, scope, time, quality, communication, risk and resources. P3 Produce a work breakdown structure and a Gantt Chart to provide timeframes and stages for completion. M1 Produce a comprehensive project management plan, milestone schedule and project schedule for monitoring and completing the aims and objectives of the project. LO2 Conduct small-scale research, information gathering and data collection to generate knowledge to support the project P4 Carry out small-scale research by applying qualitative and quantitative research methods appropriate for meeting project aims and objectives. M2 Evaluate the accuracy and reliability of different research methods applied. D1 Critically evaluate the project management process and appropriate research methodologies applied.