Answer: 4 inches Explanation: Cleanouts must be full-sized for pipes 4 inches and larger.
Answer: 18 inches and maximum 30 inches above trap weir Explanation: Prevents overflow and siphoning.
Answer: Wye fitting or combination wye and 1/8 bend Explanation: These fittings maintain smooth flow and reduce blockage risk.
Answer: 2 inches Explanation: Required to handle solids and prevent clogging.
Answer: Pressure test at working pressure or higher Explanation: Confirms system integrity.
Answer: Cleanout at or near the change Explanation: Allows maintenance access.