
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
fffffffffffffffffffffffffffffffffffff
Typology: Schemes and Mind Maps
1 / 1
This page cannot be seen from the preview
Don't miss anything!

Figure 1 : Timber Ceiling with Downlight Connection Box Exposed because of Structural Phase of Construction Finishes When we went to the construction site the finished floor finishes were not applied yet as the building was still in the structural phase but according to the provided finish schedules, we were able to get some proposed finishes. According to the floor finish schedule we were told that the floor finishes will be 600mm x 600mm ceramic tiles for the main building rooms then in the bedrooms the floor finish will be carpets. The wall finishes will be tiles in the bathrooms and in certain parts in the kitchens but in the other rooms paint will be used but the type of paint and tiles that are going to be used was not indicated. The temporary ceiling finish is timber as the building is still in the structural phase as seen in figure 1 below. The Tile finishes that are going to be used will be ceramic tiles with 600mm x 600mm dimensions and the carpet finish are brown wooden colour looking carpets. The kitchen finishes were not in the schedules as a kitchen manufacturing company is going to be called in to check for a suitable kitchen design after the house is in the proper phase for kitchen installations. The Garage floor finish will be a smooth concrete finish. Unfortunately, the ceiling, cupboard, sanitary fittings and Ironmongery finishes was not indicated on the schedules and no information was given to us.