

Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
A series of questions and answers related to icrl (item capability repair list) capability codes. It covers various codes such as a1, c1, c3, d1, d3, m1, r1, x1, x2, x3, x6, x8, x9, and z1, explaining their meanings and applications within maintenance and repair contexts. The document also addresses target capability codes (tcc) and their associated business capability models (bcm), offering insights into equipment repair authorization, technical skill requirements, and administrative procedures. This material is useful for understanding maintenance operations and repair capabilities.
Typology: Exams
1 / 2
This page cannot be seen from the preview
Don't miss anything!


A1 - ANSWER-check and test ( not at activity) C1 - ANSWER-capable of repair C1 will be assigned for all items for which the SM&R code indicates? - ANSWER-repair should be performed by the activity unless there is a deficiency in equipment (X2), skill (X3), or technical data (X6) that prevents repair C3 - ANSWER-limited repair ( I level can repair limited) D1 - ANSWER-Full D-Level Capability. Code signifies an activity as being DRP D1 - ANSWER-full level capability. item with full range of failure be completed, repaired, reworked, or overhauled (DRP code) D3 - ANSWER-Partial D-Level Capability D3 - ANSWER-Partial D-Level Capability M1 - ANSWER-assemblies and manufacturers ( I level activity) R1 - ANSWER-Repair and return to originating activity ( only used with 05A) What are the TCC and TCC DT codes - ANSWER--X2 test equipment and special tools required to perform maintenance on the component is not available -X3- use when specific MOS is required -X6- when W/C ICRL must place the required publication on order through CTPL -TCC DT- must not exceed 180 days and will be reviewed and updated semi annual. What BCM correlates with A1 - ANSWER-BCM 5 What BCM correlates with C3 - ANSWER-BCM 7 What BCM correlates with X1? - ANSWER-BCM 1 What BCM correlates with X2 - ANSWER-BCM 2 What BCM correlates with X3 - ANSWER-BCM 3 What BCM correlates with X6 - ANSWER-BCM 6 What BCM correlates with X8 - ANSWER-BCM 8
What BCM correlates with X9 - ANSWER-BCM 9 What code is always with X2, X3 and X6 - ANSWER-Target Capability Code (TCC) or Target Capability Code Date (TCC DT) what happens during the TCC DT semi annual? - ANSWER-must not exceed 180 days. what two codes are not available until OIMA is modified? - ANSWER-X8 X When Field level repairable are attempted they must be assigned? - ANSWER-C1/C X1 - ANSWER-Repair not authorized X2 - ANSWER-Lack of Authorized Equipment/Tools/Facilities X3 - ANSWER-Lack of Required Technical Skills. X6 - ANSWER-Lack of technical data X8 - ANSWER-Administrative/Repair Prohibited by Higher Authority. assigned to 05A X9 - ANSWER-field level repairable without repair potential (05A) Z1 - ANSWER-Consumable material ( I level can perform a service function like flush or cleaning) Z1 - ANSWER-consumable material. Z1 identifies material assigned what SM&R code? - ANSWER-ZZ in the fourth and fifth position or B in the 4th position