Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - ANSWER C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO During black start restoration, priority access to cranking power should be given to: A) Hot units that can return to service immediately. B) Combustion turbines in areas where the initial disturbance occurred C)Units with black start capability D) Hydro Units - ANSWER A) Hot units that can return to service immediately. During a restoration, if you are presented with the opportunity to re- connect with the Eastern Interconnection, you should: A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable. B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system C) Pursue this opportunity as quickly as possible D) Pursue this opportunity only if you need cranking power for your generating unity - ANSWER C) Pursue this opportunity as quickly as possible
Complete (Total System) Blackouts are characterized by which of the following? 1 - Most common type of blackout 2 - May require coordinating multiple islands 3 - Likely to result in Transmission overloads or other issues 4 - Affects a very large geographical area, and many customers 5 - Most commonly caused by human or switching errors A) 1 & 3 B) 2 & 4 C) 3 & 5 D) 1 - ANSWERB)2& The first step in a system restoration would be to: A) Immediately notify the media of the event B) Restore as much of the area load as possible C) Restore as much under-frequency load as possible D) Verify that communication is functional with your neighbors - ANSWER D) Verify that communication is functional with your neighbors Why would an offsite power to generating facilities be a priority during the restoration process? A) To provide safe shutdown power for the units B) To meet FERC requirements C) To provide adequate lighting for the plant operators to attempt a restart D) To prepare and expedite the return of the unit - ANSWER D) To prepare and expedite the return of the unit Factors that help determine the sequence of restoration of off-line generation include (Pick 2):
is a 200MW Steam Unit. You have also restored 150MW of under - frequency load. What is your total dynamic reserve? (Load pick-up factors are 5% for steam, 15% for hydro and 25% for CT) A) 142.5MW B) 152.5MW C) 285MW D) 292.5MW - ANSWER C) 285MW What is the most critical communication path when restoring large load blocks early in a system restoration? A) Between the Generating Unit and the Transmission Owner B) Between PJM and the generating plant C) Between the Generator Owner (or MOC) and the generating unit D) Between the transmission owner and the MOC - ANSWER A) Between the Generating Unit and the Transmission Owner Your entire system has blacked out due to an event. You receive word from PJM that the entire region is affected as well. Your blackstart generation resources are spread throughout your system, which cover a large area. Which restoration strategy would be the best for you to implement? A) Combination approach B) Bottom-up Core Island approach C) Top-down approach D) Bottom-up Multiple Island approach - ANSWER D) Bottom-up multiple island approach During a system restoration, which entity directs the loading of generation, to match the load restored? A) PJM B) The Generating Unit C) The Transmission Owner D) The Generation Owner (or MOC) - ANSWER C) The Transmission Owner
Your entire system has blacked out due to an event. You receive information the your neighboring systems are also blacked out. Your main urban load center restoration strategy would be the best for you to implement? A) Combination approach B) Bottom-up Core Island approach C) Top-down approach D) Bottom-up Multiple Island approach - ANSWER B) Bottom-up Core Island approach Select the statement that best describes why Minimum Source Requirements have been established: A) To ensure system stability prior to interconnecting with another entity B) To reduce major frequency fluctuations when energizing load C) To prevent or reduce the effects of line changing when energizing EHV transmission D) To ensure that adequate Dynamic Reserves exist prior to interconnection with another entity - ANSWER C) To prevent or reduce the effects of line changing when energizing EHV transmission Which of the following is true concerning blackouts? A) They are only possible at peak load levels B) They are only caused by Human Error C) They could occur at any time or any load level D) They cannot happen in PJM because of PJM's operating philosophies
C) primary reserve D) dynamic reserve - ANSWER D) dynamic reserve Dynamic Reserves consist of A) Governor Reserve and load that has been restored with under frequency relays B) Quick-start generation that can be loaded within 10 minutes C) On-line generation that can be loaded within 10 minutes D) Customer load that can be manually shed within 10 minutes - ANSWER A) Governor Reserve and load that has been restored with under frequency relays Each Generation Operator with a black start resource shall provide training to each of its operating personnel responsible for operating the unit at a minimum of A) One hour of training every two calendar years B) Two hours of training every two calendar years C) One hour of training every three calendar years D) Two hours of training every three calendar years - ANSWER B) Two hours of training every two calendar years Cold load pick-up is best described as A) Load that is comprised of cooling equipment such as air conditioning and fans B) Load which has been de-energized for some time and has lost its cycling characteristics C) Load circuits that are equipped with under-frequency relaying D) Characteristics of load when the temperature is below 32 degrees Fahrenheit
D) Determine the status of generation that was off-line prior to the event
A) 59.50 and 60.00 Hz B) 59.75 and 61.50 Hz C) 59.75 and 61.00 Hz D) 59.50 and 60.50 Hz - ANSWER C) 59.75 and 61.00 Hz Concerning the PJM requirements for critical Black Start generation, which of the following statements applies to the unit's capability to maintain frequency? (Select 2)
D) PJM operator will call all units assigned regulation - ANSWER C) 30 minutes prior to operating hour Over excited test results means the system is? - ANSWER Lagging (pushing VARs) Which is not a selection for unit status in eMKT? A) Baseload B) Economic C) Fixed Gen D) Emergency - ANSWER A) Baseload Which of the following statements considering Scarcity Pricing is correct? A) Generation is not subject to the $1000 offer cap during scarcity hours B) The highest market-based offer in the scarcity region set the price for the entire PJM and MISO C) Offer capping remains in effect for units that are not deemed "exempt" D) The highest market-based offer in the scarcity region sets the price for the entire scarcity region - ANSWER D) The highest market-based offer in the scarcity region sets the price for the entire scarcity region What is the formula to determine a generating units Synchronized Reserve? - ANSWER - Lesser of: (spin ramp rate * 10 min) or (spin max - current MW level) When is an IRC requested? What types of reserves does it request? - ANSWER An IRC is typically requested 30-45 min prior to a peak. Types of reserves on the check:
A) The PJM Market Monitor B) The PJM Members Committee C) NERC D) FERC - ANSWER FERC Under excited test results means the system is? - ANSWER Leading (absorbing VARs) What type of units are required to conduct Generator Reactive Testing and how often? - ANSWER Units:
During a cold weather alert, PJM will take which of the following actions? A) Adopt dynamic equipment ratings for all faclities B) Request reclosing be placed in service for all EHV facilities C) Assume an unavailability rate for scheduled generation D) Scheduled 'fuel-limited' resources run over the midnight period only - ANSWER C) Assume an unavailability rate for scheduled generation During an Environmental Alert Emergency, which entity must submit the request for variance to the appropriate government agency? A) PJM B) NERC C) The generator owner D) The transmission owner - ANSWER C) The generator owner Which of the following would be considered non critical plant load? (select 2) A) Office area air conditioners B) Induction fans C) Feed water pumps D) Lighting - ANSWER A) Office area air conditioners D) Lighting When will PJM cancel the GMD procedure? - ANSWER Measurements at Missouri or Meadowbrook fall below 10 amps and remain below for 3 hours A steam unit is considered to be resource limited when it is not capable of running at it's maximum capacity for the next A) 16 Hours B) 36 Hours C) 72 Hours D) 120 Hours - ANSWER C) 72 Hours If a steam unit falls below max capacity for ___ hours, an oil-fired CT falls below max capacity for ___ hours or a gas fired CT falls below max capacity for ___ , the PJM Master Coordinator should be notified immediately.
A) 72, 32, 8 hours respectively B) 13, 8, 72 hours respectively C) 32, 16, 8 hours respectively D) 16, 32, 8 hours respectively - ANSWER C) 32, 16, 8 hours respectively note that max capacity = max emergency during hot/cold weather alerts When a GMD is confirmed, PJM will operate at what percentage of transfer limits? A) 98% B) 95% C) 50% D) 0% - ANSWER B) 95% Which of the following reports will PJM request when a Maximum Generation Emergency Alert is issued? A) Instantaneous Reserve Check B) Minimum Generation Report C) Reactive Reserve Report D) Supplemental Status Report - ANSWER D) Supplemental Status Report When PJM declares a hot weather alert, the generation dispatcher should