Docsity
Docsity

Prepare-se para as provas
Prepare-se para as provas

Estude fácil! Tem muito documento disponível na Docsity


Ganhe pontos para baixar
Ganhe pontos para baixar

Ganhe pontos ajudando outros esrudantes ou compre um plano Premium


Guias e Dicas
Guias e Dicas


design parameters for a bridge project, Esquemas de Engenharia Civil

design parameters for a bridge project

Tipologia: Esquemas

2024

À venda por 04/11/2024

EduardoPrezzi
EduardoPrezzi 🇧🇷

3

(2)

576 documentos

1 / 22

Toggle sidebar

Esta página não é visível na pré-visualização

Não perca as partes importantes!

bg1
kjhd4wt21h-e961fed2-99eb-466a-8ce5-9e9056a6939b-3812.xls - Rev. 2.01 / 22 11/04/2024
INPUT DATA SHEET
Project : TK9764 - I/C No. 10 Deisgned :
C. Malek
Bridge : AT STA. 0+100 - LEFT & RIGHT Checked :
G. Marj
Date : 11/4/2024 Approved :
G. Marj
GEOMETRY DECK REACTIONS (kN)
Vertical Reactions Lateral loads (kN)
BF= 8.00 (m)
BT= 3.20 (m) (KN) DL Prestress LL Xi (m) a-Longitudinal
EB= 0.50 (m) ### P1 = 261.00 0.00 140.00 -10.00 a-
WC= 0.50 (m) ### P2 = 261.00 0.00 140.00 -7.50 H(brak.) 63.00
WB= 0.30 (m) ### P3 = 261.00 0.00 140.00 -5.00 H(E.Q.) 321.81
WA= 3.50 (m) ### P4 = 261.00 0.00 140.00 -2.50
WD= 0.00 (m) 0.00 P5 = 261.00 0.00 140.00 0.00 b-Transversal
BC= 1.30 (m) 652.50 P6 = 261.00 0.00 140.00 2.50 b-
BW= 0.00 (m) ### P7 = 261.00 0.00 140.00 5.00 H(E.Q.) 364.97
BX= 0.00 (m) ### P8 = 261.00 0.00 140.00 7.50
HS= 10.50 (m) ### P9 = 261.00 0.00 140.00 10.00
HF= 1.50 (m) 0.00 P10 = 0.00 0.00 0.00 0.00
HB= 1.90 (m) 0.00 P11 = 0.00 0.00 0.00 0.00
HG= 0.00 (m) 0.00 P12 = 0.00 0.00 0.00 0.00
HT= 0.60 (m) 0.00 2349.00 0.00 1260.00
LS= 25.00 (m) Soil data Materials
CR= 0.30 (m) g = 18.00 kN/m³ f'c = 25000 kN/m²
CC= 7.00 (m) f = 35.00 degree fy = 420000 kN/m²
LF= 25.00 (m) Ka = 0.271 17.00
WAW= 0.00 (m) m = 0.50 base fric. Horizontal Load factors
TH= 0.00 (m) Surch. = 11.00 kN/m² Braking 5% of L.L.
WS= 3.00 (m) i = 0.00 degree Earthquake 13.7 % of Mass
WH= 0.75 (m) b = 0.00 degree
WT= 0.30 (m) d = 0.00 degree
WW= 3.00 (m) A = 0.40 Acc. Coeff.
Kh = 0.20 = A/2
Kv= 0.00
q = 11.31 degree
gm = kN/m3
* Shall be = WA
if wing wall is
needed or = 0
EB
C1
C5
C3
C4
S1
BF
HF
HS
HT
HG
HB
S2
P1- P11
WA WB WC EB BT
CR CR
LS
P1 P11
LF
C5
C1
CC
C6
S6
S7
C2
S5
BW BC WDBX
WT
WW
C3
WH
Xi
WAW *
TH
WS
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16

Pré-visualização parcial do texto

Baixe design parameters for a bridge project e outras Esquemas em PDF para Engenharia Civil, somente na Docsity!

INPUT DATA SHEET

Project : TK9764 - I/C No. 10 Deisgned : C. Malek

Bridge : AT STA. 0+100 - LEFT & RIGHT Checked : G. Marj

Date : 11/4/2024 Approved : G. Marj

GEOMETRY DECK REACTIONS (kN)

Vertical Reactions Lateral loads (kN)

BF= 8.00 (m)

BT= 3.20 (m) (KN) DL Prestress LL Xi (m) a-Longitudinal

EB= 0. (m)

P1 = 261.00 0.00 140.00 -10.00 a-

WC= 0.50 (m) ### P2 = 261.00 0.00 140.00 -7.50 H(brak.) 63.

WB= 0.30 (m)

P3 = 261.00 0.00 140.00 -5.00 H(E.Q.) 321.

WA= 3. (m)

### P4 = 261.00 0.00 140.00 -2.

WD= 0. (m) 0.00 P5 = 261.00 0.00 140.00 0.00 b-Transversal

BC= 1.30 (m) 652.50 P6 = 261.00 0.00 140.00 2.50 b-

BW= 0. (m)

### P7 = 261.00 0.00 140.00 5.00 H(E.Q.) 364.

BX= 0.00 (m)

P8 = 261.00 0.00 140.00 7.

HS= 10.50 (m)

P9 = 261.00 0.00 140.00 10.

HF= 1. (m)

0.00 P10 = 0.00 0.00 0.00 0.

HB= 1. (m)

0.00 P11 = 0.00 0.00 0.00 0.

HG= 0.00 (m)

P12 = 0.00 0.00 0.00 0.

HT= 0.60 (m)

LS= 25.00 (m) Soil data Materials

CR= 0.30 (m) g = 18.00 kN/m³ f'c = 25000 kN/m²

CC= 7. (m) f = 35.00 degree fy = 420000 kN/m²

LF= 25.00 (m) Ka = 0.271 17.

WAW= 0.00 (m) m = 0.50 base fric. Horizontal Load factors

TH= 0.00 (m) Surch. = 11.00 kN/m² Braking 5 % of L.L.

WS= 3.00 (m) i = 0.00 degree Earthquake 13.7 % of Mass

WH= 0.75 (m) b = 0.00 degree

WT= 0.30 (m) d = 0.00 degree

WW= 3. (m) A = 0.40 Acc. Coeff.

Kh = 0.20 = A/

Kv= 0.

q = 11.31 degree

gm = kN/m

3

  • Shall be = WA

if wing wall is

needed or = 0

EB

C

C

C

C

S

BF

HF

HS

HT

HG

HB

S

P1- P

WA WB WC EB BT

CR CR

LS

P1 P

LF

C

C

CC

C

S

S

C

S

BX BW BC WD

WT

WW

C

WH

Xi

WAW *

TH WS

  • Y = 2.
  • KAE = 0.

OUTPUT DATA SHEET

1 - Own weight 2 - Soil Loads

C1 = 6987.50 (kN) 3.85 26901.88 S1 = 16537.50 (kN) 6.

C2 = 0.00 (kN) - - S2 = 864.00 (kN) 1.

C3 = 0.

(kN) 3.85 0.

S5 = 0.

(kN) -

C4 = 356.25 (kN) 4.35 1549.69 S6 = 0.00 (kN) -

C5 = 7500.00 (kN) 4.00 30000.00 S7 = 0.00 (kN) -

C6 = 28.50 (kN) 3.70 105.45 Total 17401.50 (kN)

C7 = 0.00 (kN) 0.00 0.

C8 = 84.

(kN) 5.70 480.

Total 14956. (kN)

3- Abut. Dynamic forces 4 - Static Earth pressure

E14 = 71.25 (kN) 11.05 787. Ka =

E15 = 0.00 (kN) - - es1 = 58.53 -

E16 = 1397.

(kN) 5.80 8105. es2 = 2.

E17 = 0.00 (kN) - - EP1 = 8780.08 (kN) 4.

E18 = 1500.00 (kN) 0.75 1125.00 EP2 = 894.27 (kN) 6.

E19 = 16.88 (kN) 11.63 196.17 Total (under construction) 8780.08 (kN) -

E20 = 0.00 (kN) 10.87 0.00 Total (surcharge) 894.27 (kN) -

E21 = 598.50 (kN) 11.05 6613.

E22 = 2709.

(kN) 5.80 15712.

E23 = 0.00 (kN) 6.52 0.

E24 = 0.00 (kN) 5.80 0.

E25 = 16.88 (kN) 10.95 184.

Total 6310.00 (kN) 32724.

Arm.

(m)

Moment

(kN.m)

Arm.

(m)

Arm.

(m)

Moment

(kN.m)

Arm.

(m)

(kN/m

2 )

(kN/m

2 )

E

E

E

E

E

E

E

E

EP3 E

es

Dynamic Pressures

EP EP

es

Static Pressures

es

Longitu. Transver.

5 - Deck Reactions 6-Soil Dynamic Pressures

D.L. 2349.

(kN) 3.70 8691.30 0. Ka =

L.L. 1260.00 (kN) 3.70 4662.00 0.00 es3 = 26.91 -

Brack 63.00 (kN) 8.60 - EP3 = 4036.90 (kN) 7.

Total 4036. (kN)

Bearings (R+S+T) Reaction

R+S+T 0.

(kN)

7- Earthquake reaction

g = 18. kN/m³

E.Q. 321.

(kN) 10.10 3250.311 q = 11. degree

Y =

8 - Surcharge

KAE = 0.

L.L. 962.

(kN) 6.25 6015.

9- Bill Of Quantities

Concrete 595. (m3)

Arm.

(m)

Moment

(kN.m)

Moment

(kN.m)

Arm.

(m)

(kN/m

2 )

Arm.

(m)

Moment

(kN.m)

Arm.

(m)

Moment

(kN.m)

Arm.

(m)

Moment

(kN.m)

Kdyn. =

Moment

(kN.m)

CHECKING FOR STABILITY

A- CHECKING DURING CONSTRUCTION

Group I ( D.L. + EP. + Surch.)

1 - Check for sliding 2 - Check for overturning

Total Vertical load N = 33320.63 (kN) Overturning Moment Mo = 40485.91 (kN.m)

Total Lateral load F = 9674.34 (kN) Stabilising Moment Ms = 169795.4 (kN.m)

Factor of safety F.O.S. = 1.72 Factor of safety F.O.S. = 4.

Group I ( D.L. + EP. )

1 - Check for sliding 2 - Check for overturning

Total Vertical load N = 32358.13 (kN) Overturning Moment Mo = 35120.31 (kN.m)

Total Lateral load F = 8780.08 (kN) Stabilising Moment Ms = 163779.7 (kN.m)

Factor of safety F.O.S. = 1.84 Factor of safety F.O.S. = 4.

B- CHECKING AT SERVICE LOADING

Group I ( D.L. + L.L.+ EP. + Surch.)

1 - Check for sliding 2 - Check for overturning

Total Vertical load N = 36929.63 (kN) Overturning Moment Mo = 40485.91 (kN.m)

Total Lateral load F = 9737. (kN) Stabilising Moment Ms = 183148.7 (kN.m)

Factor of safety F.O.S. = 1.90 Factor of safety F.O.S. = 4.

CHECKING FOR STABILITY

C- CHECKING DURING EARTHQUAKE

Group VII ( D.L. + EP. + E.Q.)

Stresses 133%

1 - Check for sliding 2 - Check for overturning

Total Vertical load N = 34707.13 (kN) Overturning Moment Mo = 100160.7 (kN.m)

Total Lateral load F = 19448.79 (kN) Stabilising Moment Ms = 172471.0 (kN.m)

Factor of safety F.O.S. = 0.89 Factor of safety F.O.S. = 1.

3 - Check for stresses

72310 (kN.m)

34707.1 (kN)

X = 2.083 (m)

ecc. = 1. (m)

Mfinal longitudinal 66518.19 (kN.m)

Mfinal transversal = 3686.18 (kN.m)

Total bearing pressures

q1 = 427.40 Area of base 200.

q2 = 418.56 Inertia longitudinal 1066.

q3 = -80.33 Inertia transversal 10416.

q4 = -71.48 Y longitudinal 4.

Y transversal 12.

qmax = 427.40 (kN/m2) Corresponding to a net bearing pressure of 283.56 (kN/m2)

183.13 (kN/m2)

Mnet =

N =

(kN/m

2 ) (m

2 )

(kN/m

2 ) (m

4 )

(kN/m

2 ) (m

4 )

(kN/m

2 ) (m)

(m)

qaverage/net = 3/4 qmax/net + 1/4 qmin/net =

q

q

1

q

q

BF

LF

PILE DATA SHEET

A- PILE REACTIONS

1 - Piles & Pile Cap Data

Row d p s

3 rows 26 3.88 m 12.50 m 181.15 1468.

Pile Diameter = 1000 mm

Pile Capacity = 1500 KN

PILE REACTIONS (UNFACTORED WORKING LOADS)

GROUP

I 1433 1433 1407 1407 1422 1422 100 375 -

VII 2359 2302 288 232 1436 1499 133 748 12

B- DESIGN LOADS

PILE REACTIONS (FACTORED ULTIMATE LOADS)

GROUP

I 2202 2202 1618 1618 1958 1958 100 651 -

VII 1773 1731 217 174 1080 1127 133 562 9

1 - Pile Cap Analysis Moments Shear

Row d G I G VII G I G VII

3 rows 26 Toe 1937.4 1541.9 880.62 700.

Heel 1147.9 -69.48 1117.1 342.

No.

Piles

n 1 n 2 Ymax S x

2 S y

2

X

cog

= Y

cog

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Allowable

increase in

capacity

Shear

long.

(KN)

Shear

tran.

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Pile

(KN)

Allowable

increase in

capacity

Shear

long.

(KN)

Shear

tran.

(KN)

No.

Piles

3 - Heel

(per meter)

A = 1.

Yt = 0.

Ig = 0.

Heel GROUP I GROUP VII

Mu = KN.m

d = m 1.35 1.

fr = Mpa 3.1 3.

Mcr = KN.m

1.2 Mcr = KN.m 1414.1 Redesign elastic 1414.1 1.2 Mcr < Mu, OK

m = 19.76 19.

Rn = Mpa

r = % 0.096 use rmin = 0.18% 0.

a = cm 2.56 27 5.

As = 12.97 Asmin = 27 cm2 29.

Summary of Reinforcement 1/

Foundation

POZ As CAP ARALIK ARALIK ADET

No. No.

01 28.79 20 10.91 15 Unacceptable Spac.

03 29.17 20 10.77 15 Unacceptable Spac.

05 27.00 25 18.18 15 Spac. OK

06 27.00 25 18.18 15 Spac. OK

07 27.00 25 18.18 15 Spac. OK

08 5.33 14 28.86 25 Spac. OK

09 5.33 16 37.70 25 Spac. OK

10 5.33 16 37.70 25 Spac. OK

11 19.50 20 16.11 15 Spac. OK

12 53.33 32 15.08 15 Spac. OK

13 13.98 25 35.10 15 Spac. OK

14 3 No 20 - 100 Spac. OK

(m

2 )

(m)

(m

4 )

cm

2

cm

2 / m DIAM.

mm

SPAC.

Cm

SPAC.

Cm

Summary of Reinforcement 2/

wall

POZ As CAP ARALIK ARALIK ADET

No. No.

18 ### 16 #VALUE! 15 #VALUE! Wall min horiz/face

27 ### 14 #VALUE! 15 #VALUE! BackWall min horiz

23 ### 16 #VALUE! 15 #VALUE! Back Wall min vert

24 - 14 - - - Bracket long steel

25 ### 16 #VALUE! 15 #VALUE! Bracket Main steel

26 - 16 - 20 - Bracket Dowel bars

cm

2 / m DIAM.

mm

SPAC.

Cm

SPAC.

Cm

3 - Heel

(per meter)

A = 1.

Yt = 0.

Ig = 0.

Heel GROUP I GROUP VII

Mu = KN.m

d = m 1.35 1.

fr = Mpa 3.1 3.

Mcr = KN.m

1.2 Mcr = KN.m 1414.1 Redesign elastic 1414.1 Redesign elastic

m = 19.76 19.

Rn = Mpa

r = % 0.119 use rmin = 0.18% 0.

a = cm 3.18 27 5.

As = 16.08 Asmin = 27 cm2 27.

Summary of Reinforcement 1/

Foundation

POZ As CAP ARALIK ARALIK ADET

No. No.

01 27.00 25 18.18 15 Spac. OK

03 27.75 25 17.69 15 Spac. OK

05 27.00 25 18.18 15 Spac. OK

06 27.00 25 18.18 15 Spac. OK

07 27.00 25 18.18 15 Spac. OK

08 5.33 14 28.86 25 Spac. OK

09 5.33 16 37.70 25 Spac. OK

10 5.33 16 37.70 25 Spac. OK

11 19.50 20 16.11 15 Spac. OK

12 53.33 32 15.08 15 Spac. OK

13 13.98 25 35.10 15 Spac. OK

14 3 No 20 - 100 Spac. OK

(m

2 )

(m)

(m

4 )

cm

2

cm

2 / m DIAM.

mm

SPAC.

Cm

SPAC.

Cm

Summary of Reinforcement 2/

wall

POZ As CAP ARALIK ARALIK ADET

No. No.

18 ### 16 #VALUE! 15 #VALUE! Wall min horiz/face

27 ### 14 #VALUE! 15 #VALUE! BackWall min horiz

23 ### 16 #VALUE! 15 #VALUE! Back Wall min vert

24 - 14 - - - Bracket long steel

25 ### 16 #VALUE! 15 #VALUE! Bracket Main steel

26 - 16 - 20 - Bracket Dowel bars

cm

2 / m DIAM.

mm

SPAC.

Cm

SPAC.

Cm