Assignment 2 Networking BTEC FPT, Papers of Computer Networks

Assignment 2 Networking BTEC FPT

Typology: Papers

2022/2023

Uploaded on 09/29/2023

NGUYEN_THAI_QUOC_FPIDN
NGUYEN_THAI_QUOC_FPIDN 🇻🇳

5

(3)

5 documents

1 / 68

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
BTEC FPT INTERNATIONAL COLLEGE
INFORMATION TECHNOLOGY
ASSIGNMENT 2
UNIT: Networking
STUDENT : PHAM ANH TUAN
CLASS : IT05103
STUDENT ID : BD00143
SUPERVISOR : TRUONG DANG HIEU
Da Nang, August 2022
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44

Partial preview of the text

Download Assignment 2 Networking BTEC FPT and more Papers Computer Networks in PDF only on Docsity!

BTEC FPT INTERNATIONAL COLLEGE

INFORMATION TECHNOLOGY

ASSIGNMENT 2

UNIT: Networking

STUDENT : PHAM ANH TUAN

CLASS : IT 05103

STUDENT ID : BD 00143

SUPERVISOR : TRUONG DANG HIEU

Da Nang, August 2022

ASSIGNMENT 2 FRONT SHEET Qualification BTEC Level 5 HND Diploma in Computing Unit number and title Unit 2: Networking Submission date Saturday, 20 August 2022 Date received (1st submission) Saturday, 20 August 2022 Re-submission date Date received (2nd submission) Student name Pham Anh Tuan Student ID BD 00143 Class IT 05103 Assessor name Truong Dang Hieu Student declaration: I certify that the assignment submission is entirely my own work and I fully understand the consequences of plagiarism. I understand that making a false declaration is a form of malpractice. Student’s signature: Tuan Grading grid: P5 P6 P7 P8 M3 M 4 D2 D

TABLE OF CONTENT

INSTRUCTOR/ SUPERVISOR/ ASSESSOR ………………………………………………………………………………………….i REVIEWERS ……………………………………………………………………………………………………………………….…………..iv TABLE OF CONTENT .………………………………………………………………………………………………………………………ix LIST OF TABLES AND FIGURES ……………………………………………………………………………………………………….xi LIST OF ACRONYM ………………………………………………………………………………………………………………………..xii INTRODUCTION …………………………………………………………………………………………………………………………….. CHAPTER 1 : Design efficient networked systems (LO3) ………………………………………………………………………. 2 1 .1 Provide a logical/physical design of the networked system with clear explanation and addressing table (P5)............................................................................................................................. ........................................ 2 1 .1.1 Explain the difference between logical and physical design................................................................ 1 .1.2 Discuss and explain the USER Requirement for the design................................................................. 1 .1.3 Logical design and physical design based on customer requirement................................................. 1 .1.4 Specific explanation of the design and addressing table of the networks………………………………………. 1 .2 Evaluate the design to meet the requirements (P6)..………………………………………………………..….. 1 .3 Install and configure network services and applications on your choice (M3)……….………………. CHAPTER 2 : Implement and diagnose networked systems (LO4) ……………………………………………….. 2 .1 Implement a networked system based on a prepared design (P7)……………………….…………..…… 2 .2 Document and analyse test results against expected results (P8)……………………….………….…….. 2 .3 Recommend potential enhancements for the networked systems (M4)…………………..…………… CRITICAL EVALUATION ………………………………………………………………………………………………………………… CONCLUSION ………………………………………………………………………………………………………………………………5 7 REFERENCES ………………………………………………………………………………………………………………………………...5 8

LIST OF TABLES AND FIGURES

Table 1 - 1: 1 st^ Floor’s IP Address. 2 Table 1 - 2: 2nd^ Floor’s IP Address. Table 1 - 3: IP address of the teacher room. Table 1 - 4: IP address of the marketing and administration staff’s room. Table 1 - 5: IP address of the higher manager’s room. Table 1 - 6: IP address of the network administrator’s room. Table 1 - 7: IP address of router port (router 6 & router 11). Figure 1 - 1: Ground floor 2 Figure 1 - 2 : 1st Floor (left), 2nd Floor (right). 3 Figure 1- 3 : Overall structure. 4 Figure 1 - 4 : Ground floor. 5 Figure 1- 5 : 1 st^ Floor (lab 1). 5 Figure 1- 6 : 2 nd^ Floor (lab2). 6 Figure 1- 7 : lab1 & lab2. 6 Figure 1- 8 : Teacher’s room. 7 Figure 1- 9 : Marketing and administration staff’s room. 7 Figure 1- 10 : Higher manager’s room. 8 Figure 1- 11 : Network administrator’s room. 8 Figure 1- 12 : Use command prompt to show pc’s information. 13 Figure 1- 13 : Command “ipconfig” allow showing full information. 13 Figure 1- 14 : Pinging failed at the first time. 14

LIST OF THE ACRONYM

PC Personal Computer IP Internet Protocol DNS Domain Name System FTP File Transfer Protocol BS Business Staff TS Technical Staff NAT Network Address Translation VLAN Virtual LAN DHCP Dynamic Host Configuration Protocol

INTRODUCTION

I would like to express my sincere thanks to my mentor Truong Dang Hieu for helping me with basic skills and necessary knowledge to complete this project. Thanks to your kindness, enthusiasm and ability, I would probably not to gain all of this. From there, we will test the results that we have done. Finally, we will operate the system and maintain it. It is also a process to build a complete network system. In this assignment we have three main part that you need to stay focus: CHAPTER 1 : Design efficient networked systems (LO3). 1 .1 Provide a logical/physical design of the networked system with clear explanation and addressing table (P5) CHAPTER 2 : Implement and diagnose networked systems (LO4) 1 .2 Evaluate the design to meet the requirements (P6) 1 .3 Install and configure network services and applications on your choice (M3). 2 .1 Implement a networked system based on a prepared design (P7). 2 .2 Document and analyse test results against expected results (P8). 2 .3 Recommend potential enhancements for the networked systems (M4).

 Logical design Figure 1 - 1: Ground floor. Figure 1 - 2: 1st^ Floor (left), 2nd^ Floor (right).

 Physical Design. Figure 1 - 3: Overall structure.

Figure 1 - 6: 2nd^ Floor (lab2). 1 .1.4 Specific explanation of the design and addressing table of the networks.  About Structure and function of each floor. Notice: The red line represents the router wire connected to other devices and lines! 1 st^ Floor (lab1) & 2nd^ Floor (lab 2): 25 computers for student, 1 switch and 1 printer. Figure 1 - 7: lab1 & lab2.

Ground floor: 4 room.  Teacher’s room: Including 15 computers, 1 switch and 1 printer. Figure 1 - 8 : Teacher’s room.  Marketing and administration staff’s room: Including 12 computers, 1 switch and 1 printer. Figure 1 - 9 : Marketing and administration staff’s room.

 Addressing table of network.

Table 1 - 1: 1st^ Floor’s IP Address

Table 1 - 2: 2nd^ Floor’s IP Address.

  • Figure 1- 15 : Pinging successfully.
  • Figure 1 - 16 : Sending mail.
  • Figure 1- 17 : PC-PT L1.5 (sender), PC-PT G4.1 (receiver)
  • Figure 1- 18 : Sending mail successfully.
  • Figure 1- 19 : IP configuration for DNS server.
  • Figure 1- 20 : Set up service.
  • Figure 1- 21 : IP configuration for web server.
  • Figure 1- 22 : File manager of web server.
  • Figure 1- 23 : Use programming language to design websites.
  • Figure 1- 24 : Assign domain names.
  • Figure 1- 25 : IP configuration for mail server.
  • Figure 1- 26 : Assign domain name for mail server.
  • Figure 1- 27 : Create account.
  • Figure 1- 28 : Configure mail.
  • Figure 1- 29 : IP configuration for FTP server.
  • Figure 1- 30 : User setup.
  • Figure 1- 3 1: Create a report.
  • Figure 1- 32 : File location.
  • Figure 1- 33 : Configure DHCP for lab 1 & lab2.
  • Figure 1- 34 : Disable port Fa0/0.
  • Figure 1- 35 : Static IP configuration.
  • Figure 1- 36 : Configure IP for port Fa0/0.
  • Figure 1- 37 : Configure DHCP.
  • Figure 1- 38 : Successful DHCP Configuration.
  • Figure 2 - 1 : All devices have been connected successfully.
  • Figure 2 - 2 : linking router to router.
  • Figure 2 - 3 : Linking switch to server and PC, printer.
  • Figure 2 - 4 : DHCP working.
  • Figure 2 - 5 : Configure router.
  • Figure 2 - 6 : Pinging successfully.
  • Figure 2 - 7 : DNS server.
  • Figure 2 - 8 : Web design.
  • Figure 2 - 9 : Visit website.
  • Figure 2 - 10 : FTP server.
  • Figure 2 - 11 : create a report.
  • Figure 2 - 12 : upload file to FTP server.
  • Figure 2 - 13 : File has been saved in FTP server.
  • Figure 2 - 14 : Get file.
  • Figure 2 - 15 : Filed saved in PC.
  • Figure 2 - 16 : Create Email.
  • Figure 2 - 17 : Mail sent successfully.
  • Figure 2 - 18 : router11 and router6.
  • Figure 2 - 19 : Port Fa1/0 (router6), port Eth1/2 (router11).
  • Figure 2 - 20 : set IP for port Fa1/0.
  • Figure 2 - 21 : Set IP for port Eth1/2.
  • Figure 2 - 22 : Set up router11.
  • Figure 2 - 23 : Fa1/0.
  • Figure 2 - 24 : Set up router6.
  • Figure 2 - 25 : Successfully sending mail from "PC-PT L1.15" to "PC-PT G6.1".
  • Figure 2 - 26 : Successfully pinging from "PC-PT L1.15" to "PC-PT G6.1".
  • Figure 2 - 27 : Firewall hardware.
  • Figure 2 - 28 : Firewall software.
  • Figure 2 - 29 : Backup system.
  • Figure 2 - 30 : Nerwork monitoring system and network monitoring tools.
  • Figure 2 - 31 : Suppose the situation.
  • Figure 2 - 32 : Configure switch3-Create VLAN.
  • Figure 2 - 33 : Configure switch3-Create VLAN (2).
  • Figure 2 - 34 : Public wires.
  • Figure 2 - 35 : Private wires.
  • Figure 2 - 36 : Configure switch7.
  • Figure 2 - 37 : Router11 VLAN configure.
  • Figure 2 - 38 : Configure IP for VLAN.
  • Figure 2 - 39 : Dynamic IP configuration for VLANs.
  • Figure 2 - 40 : Router11 information.
  • Figure 2 - 41 : Successful IP configuration.
  • Figure 2 - 42 : NAT configuration design.
  • Figure 2 - 43 : Configure IP for serial ports.
  • Figure 2 - 44 : Create virtual loopback.
  • Figure 2 - 45 : Configure VLAN and serial port.
  • Figure 2 - 46 : G4.3 (BS’s computer), G3.2 (TS’s computer).
  • Figure 2 - 47 : Adding wireless device.
  • Figure 2 - 48 : Internet setup
  • Figure 2 - 49 : Save change.
  • Figure 2 - 50 : DHCP Server Settings.
  • Figure 2 - 51 : Name WiFi.
  • Figure 2 - 52 : Set password for wifi.
  • Figure 2 - 53 : Install Wireless Interface module.
  • Figure 2 - 54 : Enter WiFi’s name and its password.
  • Figure 2 - 55 : Successful Wifi Configuration.
  • 1 st Floor (lab1): Network 192.195.1.0/24, default gateway: 192.195.1.
  • PC-PT L1.1 192.195.1. Computer’s name IP Address
  • PC-PT L1.2 192.195.1.
  • PC-PT L1.3 192.195.1.
  • PC-PT L1.4 192.195.1.
  • PC-PT L1.5 19 2.195.1.
  • PC-PT L1.6 192.195.1.
  • PC-PT L1.7 192.195.1.
  • PC-PT L1.8 192.195.1.
  • PC-PT L1.9 192.195.1.
  • PC-PT L1.10 192.195.1.
  • PC-PT L1.11 192.195.1.
  • PC-PT L1.12 192.195.1.
  • PC-PT L1.13 192.195.1.
  • PC-PT L1.14 192.195.1.
  • PC-PT L1.15 192.195.1.
  • PC-PT L1.16 192.195.1.
  • PC-PT L1.17 192.195.1.
  • PC-PT L1.18 192.195.1.
  • PC-PT L1.19 192.195.1.
  • PC-PT L1.20 192.195.1.
  • PC-PT L1.21 192.195.1.
  • PC-PT L1.22 192.195.1.
  • PC-PT L1.23 192.195.1.
  • PC-PT L1.24 192.195.1.
  • PC-PT L1.25 192 .195.1.
  • 2 nd Floor (lab 2 ): Network 192.195.2.0/24, default gateway: 192.195.2.
  • PC-PT L2.1 192.195.2. Computer’s name IP Address
  • PC-PT L2.2 192.195.2.
  • PC-PT L2.3 192.195.2.
  • PC-PT L2.4 192.195.2.
  • PC-PT L2.5 1 92.195.2.
  • PC-PT L2.6 192.195.2.
  • PC-PT L2.7 192.195.2.
  • PC-PT L2.8 192.195.2.
  • PC-PT L2.9 192.195.2.
  • PC-PT L2.10 192.195.2.
  • PC-PT L2.11 192.195.2.
  • PC-PT L2.12 192.195.2.
  • PC-PT L2.13 192.195.2.
  • PC-PT L2.14 192.195.2.
  • PC-PT L2.15 192.195.2.
  • PC-PT L2.16 192.195.2.
  • PC-PT L2.17 192.195.2.
  • PC-PT L2.18 192.195.2.
  • PC-PT L2.19 192.195.2.
  • PC-PT L2.20 192.195.2.
  • PC-PT L2.21 192.195.2.
  • PC-PT L2.22 192.195.2.
  • PC-PT L2.23 192.195.2.
  • PC-PT L2.24 192.195.2.
  • PC-PT L2.25 19 2.195.2.