Cost Management Plan Example-Engineering Project Management-Handout, Exercises of Software Project Management

This handout is to explain concepts of Engineering Project Management course with help of examples. It was distributed by Dr. Maaz Khan at Shree Ram Swarup College of Engineering and Management . It includes: Project, Manager, Status, Work, Breakdown, Structure, Credit, Schedule, Variance, Cost, Schedule, Performance, Index

Typology: Exercises

2011/2012
On special offer
30 Points
Discount

Limited-time offer


Uploaded on 07/23/2012

gandhavvv
gandhavvv 🇮🇳

4.5

(45)

75 documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
INTRODUCTION
The Project Manager will be responsible for managing and reporting on the project’s
cost throughout the duration of the project. During the monthly project status meeting,
the Project Manager will meet with management to present and review the project’s cost
performance for the preceding month. Performance will be measured using earned
value. The Project Manager is responsible for accounting for cost deviations and
presenting the Project Sponsor with options for getting the project back on budget. The
Project Sponsor has the authority to make changes to the project to bring it back within
budget.
COST MANAGEMENT APPROACH
Costs for this project will be managed at the fourth level of the Work Breakdown
Structure (WBS). Control Accounts (CA) will be created at this level to track costs.
Earned Value calculations for the CA’s will measure and manage the financial
performance of the project. Although activity cost estimates are detailed in the work
packages, the level of accuracy for cost management is at the fourth level of the WBS.
Credit for work will be assigned at the work package level. Work started on work
packages will grant that work package with 50% credit; whereas, the remaining 50% is
credited upon completion of all work defined in that work package. Costs may be
rounded to the nearest dollar and work hours rounded to the nearest whole hour.
Cost variances of +/- 0.1 in the cost and schedule performance indexes will change the
status of the cost to cautionary; as such, those values will be changed to yellow in the
project status reports. Cost variances of +/- 0.2 in the cost and schedule performance
indexes will change the status of the cost to an alert stage; as such, those values will be
changed to red in the project status reports. This will require corrective action from the
Project Manager in order to bring the cost and/or schedule performance indexes below
the alert level. Corrective actions will require a project change request and be must
approved by the Project Sponsor before it can become within the scope of the project.
MEASURING PROJECT COSTS
Performance of the project will be measured using Earned Value Management. The
following four Earned Value metrics will be used to measure to projects cost performance:
Schedule Variance (SV)
Cost Variance (CV)
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
docsity.com
pf2
Discount

On special offer

Partial preview of the text

Download Cost Management Plan Example-Engineering Project Management-Handout and more Exercises Software Project Management in PDF only on Docsity!

I NTRODUCTION

The Project Manager will be responsible for managing and reporting on the project’s cost throughout the duration of the project. During the monthly project status meeting, the Project Manager will meet with management to present and review the project’s cost performance for the preceding month. Performance will be measured using earned value. The Project Manager is responsible for accounting for cost deviations and presenting the Project Sponsor with options for getting the project back on budget. The Project Sponsor has the authority to make changes to the project to bring it back within budget.

C OST MANAGEMENT APPROACH

Costs for this project will be managed at the fourth level of the Work Breakdown Structure (WBS). Control Accounts (CA) will be created at this level to track costs. Earned Value calculations for the CA’s will measure and manage the financial performance of the project. Although activity cost estimates are detailed in the work packages, the level of accuracy for cost management is at the fourth level of the WBS. Credit for work will be assigned at the work package level. Work started on work packages will grant that work package with 50% credit; whereas, the remaining 50% is credited upon completion of all work defined in that work package. Costs may be rounded to the nearest dollar and work hours rounded to the nearest whole hour.

Cost variances of +/- 0.1 in the cost and schedule performance indexes will change the status of the cost to cautionary; as such, those values will be changed to yellow in the project status reports. Cost variances of +/- 0.2 in the cost and schedule performance indexes will change the status of the cost to an alert stage; as such, those values will be changed to red in the project status reports. This will require corrective action from the Project Manager in order to bring the cost and/or schedule performance indexes below the alert level. Corrective actions will require a project change request and be must approved by the Project Sponsor before it can become within the scope of the project.

MEASURING PROJECT COSTS

Performance of the project will be measured using Earned Value Management. The following four Earned Value metrics will be used to measure to projects cost performance:

 Schedule Variance (SV)  Cost Variance (CV)  Schedule Performance Index (SPI)  Cost Performance Index (CPI)

docsity.com

If the Schedule Performance Index or Cost Performance Index has a variance of between 0. and 0.2 the Project Manager must report the reason for the exception. If the SPI or CPI has a variance of greater than 0.2 the Project Manager must report the reason for the exception and provide management a detailed corrective plan to bring the projects performance back to acceptable levels.

Performance Measure Yellow Red Schedule Performance Index (SPI) Between 0.9 and 0.8 or Between 1.1 and 1.

Less Than 0.8 or Greater than 1. Cost Performance Index (CPI) Between 0.9 and 0.8 or Between 1.1 and 1.

Less Than 0.8 or Greater than 1.

R EPORTING FORMAT

Reporting for cost management will be included in the monthly project status report. The Monthly Project Status Report will include a section labeled, “Cost Management”. This section will contain the Earned Value Metrics identified in the previous section. All cost variances outside of the thresholds identified in this Cost Management Plan will be reported on including any corrective actions which are planned. Change Requests which are triggered based upon project cost overruns will be identified and tracked in this report.

C OST VARIANCE RESPONSE PROCESS

The Control Thresholds for this project is a CPI or SPI of less than 0.8 or greater than 1.2. If the project reaches one of these Control Thresholds a Cost Variance Corrective Action Plan is required. The Project Manager will present the Project Sponsor with options for corrective actions within five business days from when the cost variance is first reported. Within three business days from when the Project Sponsor selects a corrective action option, the Project Manager will present the Project Sponsor with a formal Cost Variance Corrective Action Plan. The Cost Variance Corrective Action Plan will detail the actions necessary to bring the project back within budget and the means by which the effectiveness of the actions in the plan will be measured. Upon acceptance of the Cost Variance Corrective Action Plan it will become a part of the project plan and the project will be updated to reflect the corrective actions.

C OST CHANGE CONTROL PROCESS

The cost change control process will follow the established project change request process. Approvals for project budget/cost changes must be approved by the project sponsor.