This handout is to explain concepts of Engineering Project Management course with help of examples. It was distributed by Dr. Maaz Khan at Shree Ram Swarup College of Engineering and Management. It includes: Electronic, Ballast, Project, Voltage, Regulation, Line, Filtration, Micro, Controller, Coding, Simulation

Typology: Exercises

2011/2012

Uploaded on 07/23/2012

gandhavvv
gandhavvv ๐Ÿ‡ฎ๐Ÿ‡ณ

4.5

(45)

75 documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Project๎˜ƒdescription๎˜ƒ
The electronic ballast project will initiate the manufacturing of electronic ballast circuit
for induction lamp in Pakistan. Companies will not import the circuit from aboard,
therefore the cost of induction lamp will decrease. It will also help the companies to
repair and remanufacture the circuit.
Project Objectives and Success Criteria
The objectives which mutually support the milestones and deliverables for this project
have been identified. In order to achieve success on the electronic ballast project, the
following objectives must be met within the designated time and budget allocations:
- Voltage regulation
- Line filtration
- H-bridge
- Micro controller coding
- Short circuit and open circuit protection
- Simulation
- PCB design
- Testing
Project stakeholders
Following are the stakeholders of the project.
- Project Sponsor
(Creative Electronics And Automation)
- Project Manager
(Dr. Farrukh Kamran)
- Project Team
Sheikh Shahrukh
Aqil zia
Fahad Sohail
- Customer
(User)
Project Scope
The Electronic ballast project has been created to design and manufacture electronic
ballast circuits for induction lamp in Pakistan. The costs associated with the successful
design and implementation of this project will be recovered as a result of the increased
profit.
docsity.com
pf2

Partial preview of the text

Download Project Charter Example-Project Management In Engineering-Handout and more Exercises Software Project Management in PDF only on Docsity!

Project description

The electronic ballast project will initiate the manufacturing of electronic ballast circuit for induction lamp in Pakistan. Companies will not import the circuit from aboard, therefore the cost of induction lamp will decrease. It will also help the companies to repair and remanufacture the circuit.

Project Objectives and Success Criteria

The objectives which mutually support the milestones and deliverables for this project have been identified. In order to achieve success on the electronic ballast project, the following objectives must be met within the designated time and budget allocations:

  • Voltage regulation
  • Line filtration
  • H-bridge
  • Micro controller coding
  • Short circuit and open circuit protection
  • Simulation
  • PCB design
  • Testing

Project stakeholders

Following are the stakeholders of the project.

  • Project Sponsor (Creative Electronics And Automation)
  • Project Manager (Dr. Farrukh Kamran)
  • Project Team Sheikh Shahrukh Aqil zia Fahad Sohail
  • Customer (User)

Project Scope

The Electronic ballast project has been created to design and manufacture electronic ballast circuits for induction lamp in Pakistan. The costs associated with the successful design and implementation of this project will be recovered as a result of the increased profit.

docsity.com

Assumptions

To meet the objectives and the completion of this project, following assumptions has been made :

โˆ’ The project will be completed on estimated schedule. โˆ’ The amount of budget is in accordance to the project sponsor. โˆ’ Project sponsor will provide the resources for hardware testing. โˆ’ Quality of the project will be based of the percentage completion of the project. โˆ’ Altium and Express PCB are the soft wares to be used for the simulation of the project.

Summary milestone

The project Summary Milestone Schedule is presented below. As requirements are more clearly defined this schedule may be modified. Any changes will be communicated through project status meetings by the project manager.

  • Project Start 07/09/
  • Complete Solution Design 29/11/
  • Acquire Hardware and Software 06/12/
  • Complete Solution Simulation with New Hardware/Software 11/01/
  • Complete Solution Simulation and Testing 20/02/
  • Deploy Solution 10/03/

Summary budget

The following table contains a summary budget based on the planned cost components and estimated costs required for successful completion of the project.

Summary Budget โ€“ List component project costs Project Component Component Cost Personnel Resources Rs 10, Hardware Design Rs 20, Electronic Components Rs 50, Total Rs 80,