Assignment 2 1620., Study Guides, Projects, Research of Professional Communication

Outline and RQF for assignment 1

Typology: Study Guides, Projects, Research

2021/2022

Uploaded on 10/23/2022

thai-van-chien
thai-van-chien 🇻🇳

5 documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ASSIGNMENT 1 BRIEF
Qualification BTEC Level 5 HND Diploma in Computing
Unit number Unit 3: Professional Practice
Assignment title Planning an SDP Event
Academic Year 2022
Unit Tutor
Issue date 7th January 2022 Submission date
IV name and date
Submission format
Part 1: Requirements
The submission should be made in the form of a completed individual portfolio folder, which includes all
the tasks outlined in the Assignment Brief. Although this assignment requires collaborative work, each
student must submit an individual portfolio folder.
Part 1: Produce a five-day professional event schedule (using project management software) and WBS
(work breakdown structure) prior to the five-day development event that details planning and resource
allocation including the Responsibility Assignment Matrix.
Part 2: Create a ten-minute PowerPoint presentation on 'team dynamics' that includes a presentation and
an activity sheet that requires delegates to participate in a team-building activity. (Maximum of eight
slides, including the introductory slide).
Part 3: A written evaluation of your performance in this task and your contribution to the team.
You are required to make use of headings, paragraphs, subsections, and illustrations as appropriate, and
all work must be supported with research and referenced using the Harvard referencing system. The
recommended word limit is 500–1,000 words, although you will not be penalized for exceeding the total
word limit. (Anh, 2018)
pf3
pf4

Partial preview of the text

Download Assignment 2 1620. and more Study Guides, Projects, Research Professional Communication in PDF only on Docsity!

ASSIGNMENT 1 BRIEF

Qualification BTEC Level 5 HND Diploma in Computing Unit number Unit 3: Professional Practice Assignment title Planning an SDP Event Academic Year 2022 Unit Tutor Issue date 7 th^ January 2022 Submission date IV name and date Submission format Part 1: Requirements The submission should be made in the form of a completed individual portfolio folder, which includes all the tasks outlined in the Assignment Brief. Although this assignment requires collaborative work, each student must submit an individual portfolio folder. Part 1: Produce a five-day professional event schedule (using project management software) and WBS (work breakdown structure) prior to the five-day development event that details planning and resource allocation including the Responsibility Assignment Matrix. Part 2: Create a ten-minute PowerPoint presentation on 'team dynamics' that includes a presentation and an activity sheet that requires delegates to participate in a team-building activity. (Maximum of eight slides, including the introductory slide). Part 3: A written evaluation of your performance in this task and your contribution to the team. You are required to make use of headings, paragraphs, subsections, and illustrations as appropriate , and all work must be supported with research and referenced using the Harvard referencing system. The recommended word limit is 500–1,000 words, although you will not be penalized for exceeding the total word limit. (Anh, 2018)

Assignment Brief and Guidance You have been tasked with the responsibility of overseeing the development of an e-commerce solution for a Fortune 500 company. As a member of the development team, you will develop a plan, basing on the SDP (software development plan) that will be distributed to internal employees and stakeholders within the organization in which you work. You will develop a professional plan for this upcoming project by simulating real-world events, meeting locations, agendas, feasibility reports, and associated costs. NOTE : “ You do not carryout real meeting in the venue but must get actual quotes of prices and facilities in real life. ” You are expected to conduct thorough research on venue costs, transportation costs (if the project takes place outside of the city), and team member feeding and lodging. Assuming you have an experienced team of designers and developers, the development process is estimated to take no more than five days. The following is a description of SDP. The Software Development Plan (SDP) is a document that describes how a developer intends to proceed with a software development effort. The SDP provides insight into and a tool for monitoring software development processes to the acquirer. Additionally, it details the procedures to be followed and the approach to be taken regarding each activity, organization, and resource. The SDP's purpose is to communicate to team members and stakeholders how a program's software will be developed and how a Program Manager will allocate direct resources. Working in small groups (3-4 per group): Part 1. Produce a professional event schedule (using project management software) and WBS (work breakdown structure) prior to the five-day development event that details planning and resource allocation including the (Responsibility Assignment Matrix) Part 2. Create a ten-minute PowerPoint presentation on 'team dynamics' that includes a presentation and an activity sheet that requires delegates to participate in a team-building activity. (Maximum of eight slides, including the introductory slide) Working individually:

P4 Demonstrate that critical reasoning has been applied to a given solution. M3 Justify the use and application of a range of solution methodologies.

Bibliography

Anh, 2018: , (Anh, 2018),