. Consider a two area power system A and B. For Area A: Load: 10,000MW, generation 8000MW, Capacity: 10,000MW; RApu=0.04; For Area B: Load: 20,000MW, Generation: 22,000; Capacity 25,000MW; RBpu=0.04. The schedule interchange is 2000MW flowing from B to A. For a loss of 2000MW of load in area A (With no supplementary control), Determine: a) (10pts) Steady state frequency b) (10pts) Generation and load of each area c) (5pts) Tile line flow